Tubed Tire Specification Example for Off-Road Bikes: Sealed Unit
Tubed Tire Specification Example for Off-Road Bikes: Sealed Unit
This is a worked specification for tubed tire in a sealed unit programme. It is the document we would send a buyer who asks what exactly they are getting: the material, the dimensions that are actually controlled, the finish, and the checks that happen before anything is packed.
The sealed unit version exists because the duty cycle on off-road bikes is not the same as on a showroom vehicle. Where the two are specified identically, something fails later — usually reorders that did not match the approved sample.

Example specification
| Item | Tubed Tire |
|---|---|
| Application | Off-Road Bikes |
| Version | Sealed Unit |
| Base material | High Density Foam |
| Controlled dimensions | 4 key dimensions, recorded per lot |
| Tolerance band | ±0.5 mm |
| Finish | as machined |
| MOQ | 2,000 pieces per specification |
| Sampling | 14 working days, 5 days per revision |
| Compliance | ECE R90 |
How the example is built up
- Start from the duty cycle, not from the catalogue photograph.
- Fix the base material in writing — High Density Foam, in this example.
- List the dimensions that are actually controlled and the tolerance on each.
- Name the finish and what it has to survive.
- State the inspection level and who pays when a lot fails.

Processes involved
- injection moulding
- ultrasonic cleaning
- robot welding
- anodising
- surface grinding
- die casting
Where this example applies
Programmes that run sealed unit most often specify this build for off-road bikes. Related applications include delivery vans, off-road bikes, agricultural trailers, municipal fleets, boat trailers.
Checks before packing
- Dimensional report against the approved drawing.
- AQL 4.0 sampling on the finished lot.
- Finish inspection under agreed lighting.
- Carton drop test on the first lot of a new packing specification.
Questions buyers ask
Can the specification be held on file?
Yes. Once approved, the specification is recorded against your part number so a reorder reproduces the ECE R90-compliant build instead of a fresh interpretation.
What happens if a lot fails inspection?
The lot is re-inspected against the golden sample, and replacement pieces ship on the next available booking at our cost.
Can you match an existing sample?
Send a sample and we will reverse-engineer the specification, then produce a counter sample for approval before any bulk starts.
What testing is included?
Standard lots ship with dimensional and hardness reports. ECE R90 documentation is issued with the shipment when your market requires it.
Send the part number, the annual volume and the target market, and we will come back with a specification and a sampling plan.



