Highway Tire Specification Example for Scooter Fleets: Waterproof Version
Highway Tire Specification Example for Scooter Fleets: Waterproof Version
This is a worked specification for highway tire in a waterproof version programme. It is the document we would send a buyer who asks what exactly they are getting: the material, the dimensions that are actually controlled, the finish, and the checks that happen before anything is packed.
The waterproof version version exists because the duty cycle on scooter fleets is not the same as on a showroom vehicle. Where the two are specified identically, something fails later — usually documentation that arrived after the container shipped.

Example specification
| Item | Highway Tire |
|---|---|
| Application | Scooter Fleets |
| Version | Waterproof Version |
| Base material | ABS Plastic |
| Controlled dimensions | 4 key dimensions, recorded per lot |
| Tolerance band | ±0.5 mm |
| Finish | anodised |
| MOQ | 200 pieces per specification |
| Sampling | 7 working days, 5 days per revision |
| Compliance | CCC |
How the example is built up
- Start from the duty cycle, not from the catalogue photograph.
- Fix the base material in writing — ABS Plastic, in this example.
- List the dimensions that are actually controlled and the tolerance on each.
- Name the finish and what it has to survive.
- State the inspection level and who pays when a lot fails.

Processes involved
- CNC machining
- ultrasonic cleaning
- heat treatment
- powder coating
- assembly line testing
- robot welding
Where this example applies
Programmes that run waterproof version most often specify this build for scooter fleets. Related applications include scooter fleets, racing teams, boat trailers, passenger cars, dealership service.
Checks before packing
- Dimensional report against the approved drawing.
- AQL 1.5 sampling on the finished lot.
- Finish inspection under agreed lighting.
- Carton drop test on the first lot of a new packing specification.
Questions buyers ask
What testing is included?
Standard lots ship with dimensional and hardness reports. CCC documentation is issued with the shipment when your market requires it.
What happens if a lot fails inspection?
The lot is re-inspected against the golden sample, and replacement pieces ship on the next available booking at our cost.
How long does sampling take?
Samples leave the factory in 7 working days, and each revision round adds about 5 days once you have seen the first piece.
Can the specification be held on file?
Yes. Once approved, the specification is recorded against your part number so a reorder reproduces the CCC-compliant build instead of a fresh interpretation.
Tell us the model, the fitment and the quantity and we will hold a production slot for you.



