Welcome to Auto, Motorcycle Parts & Accessories official website!

63 Inch Titan Tire Specification Example for Light Trucks: Vented Design

Source:Motorbike Chain Lock / Time:2026-09-18

63 Inch Titan Tire Specification Example for Light Trucks: Vented Design

This is a worked specification for 63 inch titan tire in a vented design programme. It is the document we would send a buyer who asks what exactly they are getting: the material, the dimensions that are actually controlled, the finish, and the checks that happen before anything is packed.

The vented design version exists because the duty cycle on light trucks is not the same as on a showroom vehicle. Where the two are specified identically, something fails later — usually premature wear on the first batch.

63 Inch Titan Tire

Example specification

Item63 Inch Titan Tire
ApplicationLight Trucks
VersionVented Design
Base materialAnodised Aluminium
Controlled dimensions3 key dimensions, recorded per lot
Tolerance band±0.5 mm
Finishpainted
MOQ3,000 pieces per specification
Sampling14 working days, 3 days per revision
ComplianceE-mark

How the example is built up

  1. Start from the duty cycle, not from the catalogue photograph.
  2. Fix the base material in writing — Anodised Aluminium, in this example.
  3. List the dimensions that are actually controlled and the tolerance on each.
  4. Name the finish and what it has to survive.
  5. State the inspection level and who pays when a lot fails.

63 Inch Titan Tire example

Processes involved

  • electroplating
  • heat treatment
  • anodising
  • laser cutting
  • precision stamping
  • die casting

Where this example applies

Programmes that run vented design most often specify this build for light trucks. Related applications include municipal fleets, racing teams, aftermarket retail, boat trailers, utility trailers.

Checks before packing

  • Dimensional report against the approved drawing.
  • AQL 1.5 sampling on the finished lot.
  • Finish inspection under agreed lighting.
  • Carton drop test on the first lot of a new packing specification.

Questions buyers ask

What happens if a lot fails inspection?

The lot is re-inspected against the golden sample, and replacement pieces ship on the next available booking at our cost.

Can you match an existing sample?

Send a sample and we will reverse-engineer the specification, then produce a counter sample for approval before any bulk starts.

How long does sampling take?

Samples leave the factory in 14 working days, and each revision round adds about 3 days once you have seen the first piece.

What testing is included?

Standard lots ship with dimensional and hardness reports. E-mark documentation is issued with the shipment when your market requires it.

Send the specification you are working to and we will confirm what we can match, what we would change and why.

Online customer service
WeChat contact
Customer service
Scan code to add Wechat (same mobile phone number)
Telephone consultation
Back to top