Welcome to Auto, Motorcycle Parts & Accessories official website!

Electric Power Steering System Specification Example for Trailer Axles: Drilled and Slotted

Source:Engine Oil Sump / Time:2026-09-18

Electric Power Steering System Specification Example for Trailer Axles: Drilled and Slotted

This is a worked specification for electric power steering system in a drilled and slotted programme. It is the document we would send a buyer who asks what exactly they are getting: the material, the dimensions that are actually controlled, the finish, and the checks that happen before anything is packed.

The drilled and slotted version exists because the duty cycle on trailer axles is not the same as on a showroom vehicle. Where the two are specified identically, something fails later — usually warranty claims traced back to a single lot.

Electric Power Steering System

Example specification

ItemElectric Power Steering System
ApplicationTrailer Axles
VersionDrilled and Slotted
Base materialCarbon Steel
Controlled dimensions4 key dimensions, recorded per lot
Tolerance band±0.05 mm
Finishzinc plated
MOQ3,000 pieces per specification
Sampling10 working days, 3 days per revision
ComplianceIATF 16949

How the example is built up

  1. Start from the duty cycle, not from the catalogue photograph.
  2. Fix the base material in writing — Carbon Steel, in this example.
  3. List the dimensions that are actually controlled and the tolerance on each.
  4. Name the finish and what it has to survive.
  5. State the inspection level and who pays when a lot fails.

Electric Power Steering System example

Processes involved

  • anodising
  • CNC machining
  • cold forging
  • gravity casting
  • ultrasonic cleaning
  • powder coating

Where this example applies

Programmes that run drilled and slotted most often specify this build for trailer axles. Related applications include construction equipment, camper conversions, fleet maintenance, trailer axles, courier fleets.

Checks before packing

  • Dimensional report against the approved drawing.
  • AQL 1.5 sampling on the finished lot.
  • Finish inspection under agreed lighting.
  • Carton drop test on the first lot of a new packing specification.

Questions buyers ask

What is the minimum order quantity?

The standard MOQ is 3000 pieces per specification. Mixed sizes inside one shipment are accepted once the total reaches that figure.

Do you handle mixed containers?

Yes. Most programmes consolidate several part numbers into one container to keep freight sensible at 3000 pieces per line.

What testing is included?

Standard lots ship with dimensional and hardness reports. IATF 16949 documentation is issued with the shipment when your market requires it.

Can the specification be held on file?

Yes. Once approved, the specification is recorded against your part number so a reorder reproduces the IATF 16949-compliant build instead of a fresh interpretation.

Share a sample or a drawing and we will quote against a written specification, not against a photograph.

Online customer service
WeChat contact
Customer service
Scan code to add Wechat (same mobile phone number)
Telephone consultation
Back to top