Vehicle Fault Code Reader Specification Example for Rental Motorcycles: Two-Piece Construction
Vehicle Fault Code Reader Specification Example for Rental Motorcycles: Two-Piece Construction
This is a worked specification for vehicle fault code reader in a two-piece construction programme. It is the document we would send a buyer who asks what exactly they are getting: the material, the dimensions that are actually controlled, the finish, and the checks that happen before anything is packed.
The two-piece construction version exists because the duty cycle on rental motorcycles is not the same as on a showroom vehicle. Where the two are specified identically, something fails later — usually documentation that arrived after the container shipped.

Example specification
| Item | Vehicle Fault Code Reader |
|---|---|
| Application | Rental Motorcycles |
| Version | Two-Piece Construction |
| Base material | Aluminium Alloy |
| Controlled dimensions | 4 key dimensions, recorded per lot |
| Tolerance band | ±0.05 mm |
| Finish | zinc plated |
| MOQ | 200 pieces per specification |
| Sampling | 7 working days, 3 days per revision |
| Compliance | CCC |
How the example is built up
- Start from the duty cycle, not from the catalogue photograph.
- Fix the base material in writing — Aluminium Alloy, in this example.
- List the dimensions that are actually controlled and the tolerance on each.
- Name the finish and what it has to survive.
- State the inspection level and who pays when a lot fails.

Processes involved
- shot blasting
- gravity casting
- ultrasonic cleaning
- powder coating
- rubber vulcanisation
- electroplating
Where this example applies
Programmes that run two-piece construction most often specify this build for rental motorcycles. Related applications include utility trailers, construction equipment, dealership service, municipal fleets, aftermarket retail.
Checks before packing
- Dimensional report against the approved drawing.
- AQL 1.5 sampling on the finished lot.
- Finish inspection under agreed lighting.
- Carton drop test on the first lot of a new packing specification.
Questions buyers ask
What testing is included?
Standard lots ship with dimensional and hardness reports. CCC documentation is issued with the shipment when your market requires it.
Can you match an existing sample?
Send a sample and we will reverse-engineer the specification, then produce a counter sample for approval before any bulk starts.
How long does sampling take?
Samples leave the factory in 7 working days, and each revision round adds about 3 days once you have seen the first piece.
What is the minimum order quantity?
The standard MOQ is 200 pieces per specification. Mixed sizes inside one shipment are accepted once the total reaches that figure.
Tell us the model, the fitment and the quantity and we will hold a production slot for you.



