Welcome to Auto, Motorcycle Parts & Accessories official website!

Fuel Storage System Specification Example for Delivery Vans: Load Rated Version

Source:Off-The-Road (OTR) Tires / Time:2026-09-18

Fuel Storage System Specification Example for Delivery Vans: Load Rated Version

This is a worked specification for fuel storage system in a load rated version programme. It is the document we would send a buyer who asks what exactly they are getting: the material, the dimensions that are actually controlled, the finish, and the checks that happen before anything is packed.

The load rated version version exists because the duty cycle on delivery vans is not the same as on a showroom vehicle. Where the two are specified identically, something fails later — usually a specification nobody had written down.

Fuel Storage System

Example specification

ItemFuel Storage System
ApplicationDelivery Vans
VersionLoad Rated Version
Base materialForged Aluminium
Controlled dimensions5 key dimensions, recorded per lot
Tolerance band±0.2 mm
Finishanodised
MOQ200 pieces per specification
Sampling7 working days, 3 days per revision
ComplianceIATF 16949

How the example is built up

  1. Start from the duty cycle, not from the catalogue photograph.
  2. Fix the base material in writing — Forged Aluminium, in this example.
  3. List the dimensions that are actually controlled and the tolerance on each.
  4. Name the finish and what it has to survive.
  5. State the inspection level and who pays when a lot fails.

Fuel Storage System example

Processes involved

  • electroplating
  • robot welding
  • ultrasonic cleaning
  • die casting
  • cold forging
  • assembly line testing

Where this example applies

Programmes that run load rated version most often specify this build for delivery vans. Related applications include utility trailers, city buses, courier fleets, workshop replacements, municipal fleets.

Checks before packing

  • Dimensional report against the approved drawing.
  • AQL 1.5 sampling on the finished lot.
  • Finish inspection under agreed lighting.
  • Carton drop test on the first lot of a new packing specification.

Questions buyers ask

What happens if a lot fails inspection?

The lot is re-inspected against the golden sample, and replacement pieces ship on the next available booking at our cost.

How long does sampling take?

Samples leave the factory in 7 working days, and each revision round adds about 3 days once you have seen the first piece.

What testing is included?

Standard lots ship with dimensional and hardness reports. IATF 16949 documentation is issued with the shipment when your market requires it.

Do you handle mixed containers?

Yes. Most programmes consolidate several part numbers into one container to keep freight sensible at 200 pieces per line.

Tell us the model, the fitment and the quantity and we will hold a production slot for you.

Online customer service
WeChat contact
Customer service
Scan code to add Wechat (same mobile phone number)
Telephone consultation
Back to top