Welcome to Auto, Motorcycle Parts & Accessories official website!

Portable Car Lift Specification Example for Construction Equipment: Two-Piece Construction

Source:Steel Wheel Hub / Time:2026-09-18

Portable Car Lift Specification Example for Construction Equipment: Two-Piece Construction

This is a worked specification for portable car lift in a two-piece construction programme. It is the document we would send a buyer who asks what exactly they are getting: the material, the dimensions that are actually controlled, the finish, and the checks that happen before anything is packed.

The two-piece construction version exists because the duty cycle on construction equipment is not the same as on a showroom vehicle. Where the two are specified identically, something fails later — usually warranty claims traced back to a single lot.

Portable Car Lift

Example specification

ItemPortable Car Lift
ApplicationConstruction Equipment
VersionTwo-Piece Construction
Base materialStainless Steel
Controlled dimensions3 key dimensions, recorded per lot
Tolerance band±0.2 mm
Finishpainted
MOQ500 pieces per specification
Sampling14 working days, 5 days per revision
ComplianceECE R90

How the example is built up

  1. Start from the duty cycle, not from the catalogue photograph.
  2. Fix the base material in writing — Stainless Steel, in this example.
  3. List the dimensions that are actually controlled and the tolerance on each.
  4. Name the finish and what it has to survive.
  5. State the inspection level and who pays when a lot fails.

Portable Car Lift example

Processes involved

  • ultrasonic cleaning
  • die casting
  • CNC machining
  • surface grinding
  • injection moulding
  • electroplating

Where this example applies

Programmes that run two-piece construction most often specify this build for construction equipment. Related applications include utility trailers, construction equipment, scooter fleets, workshop replacements, long-haul trucks.

Checks before packing

  • Dimensional report against the approved drawing.
  • AQL 4.0 sampling on the finished lot.
  • Finish inspection under agreed lighting.
  • Carton drop test on the first lot of a new packing specification.

Questions buyers ask

What testing is included?

Standard lots ship with dimensional and hardness reports. ECE R90 documentation is issued with the shipment when your market requires it.

How is packing specified?

Individual packing, inner box quantity and carton marking are confirmed at quotation stage so the cartons arrive ready for your warehouse.

What happens if a lot fails inspection?

The lot is re-inspected against the golden sample, and replacement pieces ship on the next available booking at our cost.

Do you handle mixed containers?

Yes. Most programmes consolidate several part numbers into one container to keep freight sensible at 500 pieces per line.

Share a sample or a drawing and we will quote against a written specification, not against a photograph.

Online customer service
WeChat contact
Customer service
Scan code to add Wechat (same mobile phone number)
Telephone consultation
Back to top