This is a worked specification for off-the-road (otr) tires in a quick fit version programme. It is the document we would send a buyer who asks what exactly they are getting: the material, the dimensions that are actually controlled, the finish, and the checks that happen before anything is packed.
The quick fit version version exists because the duty cycle on assembly programmes is not the same as on a showroom vehicle. Where the two are specified identically, something fails later — usually reorders that did not match the approved sample.

Example specification
| Item | Off-The-Road (OTR) Tires |
|---|---|
| Application | Assembly Programmes |
| Version | Quick Fit Version |
| Base material | Aluminium Alloy |
| Controlled dimensions | 4 key dimensions, recorded per lot |
| Tolerance band | ±0.1 mm |
| Finish | anodised |
| MOQ | 3,000 pieces per specification |
| Sampling | 10 working days, 3 days per revision |
| Compliance | E-mark |
How the example is built up
- Start from the duty cycle, not from the catalogue photograph.
- Fix the base material in writing — Aluminium Alloy, in this example.
- List the dimensions that are actually controlled and the tolerance on each.
- Name the finish and what it has to survive.
- State the inspection level and who pays when a lot fails.

Processes involved
- cold forging
- powder coating
- shot blasting
- surface grinding
- CNC machining
- gravity casting
Where this example applies
Programmes that run quick fit version most often specify this build for assembly programmes. Related applications include passenger cars, delivery vans, assembly programmes, long-haul trucks, trailer axles.
Checks before packing
- Dimensional report against the approved drawing.
- AQL 1.5 sampling on the finished lot.
- Finish inspection under agreed lighting.
- Carton drop test on the first lot of a new packing specification.
Questions buyers ask
What happens if a lot fails inspection?
The lot is re-inspected against the golden sample, and replacement pieces ship on the next available booking at our cost.
What is the minimum order quantity?
The standard MOQ is 3000 pieces per specification. Mixed sizes inside one shipment are accepted once the total reaches that figure.
Can the specification be held on file?
Yes. Once approved, the specification is recorded against your part number so a reorder reproduces the E-mark-compliant build instead of a fresh interpretation.
What testing is included?
Standard lots ship with dimensional and hardness reports. E-mark documentation is issued with the shipment when your market requires it.
Share a sample or a drawing and we will quote against a written specification, not against a photograph.