Welcome to Auto, Motorcycle Parts & Accessories official website!

Turbocharged Engine Specification Example for Passenger Cars: Load Rated Version

Source:Fuel Auto Filter / Time:2026-09-18

Turbocharged Engine Specification Example for Passenger Cars: Load Rated Version

This is a worked specification for turbocharged engine in a load rated version programme. It is the document we would send a buyer who asks what exactly they are getting: the material, the dimensions that are actually controlled, the finish, and the checks that happen before anything is packed.

The load rated version version exists because the duty cycle on passenger cars is not the same as on a showroom vehicle. Where the two are specified identically, something fails later — usually premature wear on the first batch.

Turbocharged Engine

Example specification

ItemTurbocharged Engine
ApplicationPassenger Cars
VersionLoad Rated Version
Base materialCarbon Steel
Controlled dimensions4 key dimensions, recorded per lot
Tolerance band±0.05 mm
Finishas machined
MOQ200 pieces per specification
Sampling14 working days, 5 days per revision
ComplianceISO/TS 16949

How the example is built up

  1. Start from the duty cycle, not from the catalogue photograph.
  2. Fix the base material in writing — Carbon Steel, in this example.
  3. List the dimensions that are actually controlled and the tolerance on each.
  4. Name the finish and what it has to survive.
  5. State the inspection level and who pays when a lot fails.

Turbocharged Engine example

Processes involved

  • rubber vulcanisation
  • powder coating
  • robot welding
  • anodising
  • CNC machining
  • surface grinding

Where this example applies

Programmes that run load rated version most often specify this build for passenger cars. Related applications include emergency vehicles, racing teams, rental motorcycles, trailer axles, city buses.

Checks before packing

  • Dimensional report against the approved drawing.
  • AQL 4.0 sampling on the finished lot.
  • Finish inspection under agreed lighting.
  • Carton drop test on the first lot of a new packing specification.

Questions buyers ask

What testing is included?

Standard lots ship with dimensional and hardness reports. ISO/TS 16949 documentation is issued with the shipment when your market requires it.

What happens if a lot fails inspection?

The lot is re-inspected against the golden sample, and replacement pieces ship on the next available booking at our cost.

Can the specification be held on file?

Yes. Once approved, the specification is recorded against your part number so a reorder reproduces the ISO/TS 16949-compliant build instead of a fresh interpretation.

How long does sampling take?

Samples leave the factory in 14 working days, and each revision round adds about 5 days once you have seen the first piece.

Send the part number, the annual volume and the target market, and we will come back with a specification and a sampling plan.

Online customer service
WeChat contact
Customer service
Scan code to add Wechat (same mobile phone number)
Telephone consultation
Back to top