Welcome to Auto, Motorcycle Parts & Accessories official website!

CV Joint Drive Shaft Specification Example for Utility Trailers: Load Rated Version

Source:Automotive Air Conditioning / Time:2026-09-18

CV Joint Drive Shaft Specification Example for Utility Trailers: Load Rated Version

This is a worked specification for cv joint drive shaft in a load rated version programme. It is the document we would send a buyer who asks what exactly they are getting: the material, the dimensions that are actually controlled, the finish, and the checks that happen before anything is packed.

The load rated version version exists because the duty cycle on utility trailers is not the same as on a showroom vehicle. Where the two are specified identically, something fails later — usually warranty claims traced back to a single lot.

CV Joint Drive Shaft

Example specification

ItemCV Joint Drive Shaft
ApplicationUtility Trailers
VersionLoad Rated Version
Base materialBrass
Controlled dimensions5 key dimensions, recorded per lot
Tolerance band±0.1 mm
Finishpainted
MOQ3,000 pieces per specification
Sampling10 working days, 3 days per revision
ComplianceSGS

How the example is built up

  1. Start from the duty cycle, not from the catalogue photograph.
  2. Fix the base material in writing — Brass, in this example.
  3. List the dimensions that are actually controlled and the tolerance on each.
  4. Name the finish and what it has to survive.
  5. State the inspection level and who pays when a lot fails.

CV Joint Drive Shaft example

Processes involved

  • heat treatment
  • rubber vulcanisation
  • powder coating
  • electroplating
  • die casting
  • shot blasting

Where this example applies

Programmes that run load rated version most often specify this build for utility trailers. Related applications include light trucks, courier fleets, long-haul trucks, passenger cars, scooter fleets.

Checks before packing

  • Dimensional report against the approved drawing.
  • AQL 1.5 sampling on the finished lot.
  • Finish inspection under agreed lighting.
  • Carton drop test on the first lot of a new packing specification.

Questions buyers ask

Can the specification be held on file?

Yes. Once approved, the specification is recorded against your part number so a reorder reproduces the SGS-compliant build instead of a fresh interpretation.

Do you handle mixed containers?

Yes. Most programmes consolidate several part numbers into one container to keep freight sensible at 3000 pieces per line.

What testing is included?

Standard lots ship with dimensional and hardness reports. SGS documentation is issued with the shipment when your market requires it.

What is the minimum order quantity?

The standard MOQ is 3000 pieces per specification. Mixed sizes inside one shipment are accepted once the total reaches that figure.

Tell us the model, the fitment and the quantity and we will hold a production slot for you.

Online customer service
WeChat contact
Customer service
Scan code to add Wechat (same mobile phone number)
Telephone consultation
Back to top