Welcome to Auto, Motorcycle Parts & Accessories official website!

Car AC Compressor Specification Example for Workshop Replacements: Load Rated Version

Source:AC Fan Motor / Time:2026-09-18

Car AC Compressor Specification Example for Workshop Replacements: Load Rated Version

This is a worked specification for car ac compressor in a load rated version programme. It is the document we would send a buyer who asks what exactly they are getting: the material, the dimensions that are actually controlled, the finish, and the checks that happen before anything is packed.

The load rated version version exists because the duty cycle on workshop replacements is not the same as on a showroom vehicle. Where the two are specified identically, something fails later — usually inconsistent hardness between lots.

Car AC Compressor

Example specification

ItemCar AC Compressor
ApplicationWorkshop Replacements
VersionLoad Rated Version
Base materialKevlar Composite
Controlled dimensions4 key dimensions, recorded per lot
Tolerance band±0.5 mm
Finishanodised
MOQ500 pieces per specification
Sampling10 working days, 5 days per revision
ComplianceE-mark

How the example is built up

  1. Start from the duty cycle, not from the catalogue photograph.
  2. Fix the base material in writing — Kevlar Composite, in this example.
  3. List the dimensions that are actually controlled and the tolerance on each.
  4. Name the finish and what it has to survive.
  5. State the inspection level and who pays when a lot fails.

Car AC Compressor example

Processes involved

  • CNC machining
  • precision stamping
  • assembly line testing
  • shot blasting
  • gravity casting
  • sintering

Where this example applies

Programmes that run load rated version most often specify this build for workshop replacements. Related applications include assembly programmes, boat trailers, scooter fleets, aftermarket retail, courier fleets.

Checks before packing

  • Dimensional report against the approved drawing.
  • AQL 2.5 sampling on the finished lot.
  • Finish inspection under agreed lighting.
  • Carton drop test on the first lot of a new packing specification.

Questions buyers ask

How long does sampling take?

Samples leave the factory in 10 working days, and each revision round adds about 5 days once you have seen the first piece.

What testing is included?

Standard lots ship with dimensional and hardness reports. E-mark documentation is issued with the shipment when your market requires it.

Do you handle mixed containers?

Yes. Most programmes consolidate several part numbers into one container to keep freight sensible at 500 pieces per line.

What happens if a lot fails inspection?

The lot is re-inspected against the golden sample, and replacement pieces ship on the next available booking at our cost.

Ask for the current catalogue and the specification sheet for this line.

Online customer service
WeChat contact
Customer service
Scan code to add Wechat (same mobile phone number)
Telephone consultation
Back to top