Welcome to Auto, Motorcycle Parts & Accessories official website!

AC Receiver Drier Specification Example for Long-Haul Trucks: Drilled and Slotted

Source:12V Electric Car Fridge / Time:2026-09-18

AC Receiver Drier Specification Example for Long-Haul Trucks: Drilled and Slotted

This is a worked specification for ac receiver drier in a drilled and slotted programme. It is the document we would send a buyer who asks what exactly they are getting: the material, the dimensions that are actually controlled, the finish, and the checks that happen before anything is packed.

The drilled and slotted version exists because the duty cycle on long-haul trucks is not the same as on a showroom vehicle. Where the two are specified identically, something fails later — usually premature wear on the first batch.

AC Receiver Drier

Example specification

ItemAC Receiver Drier
ApplicationLong-Haul Trucks
VersionDrilled and Slotted
Base materialCeramic Composite
Controlled dimensions6 key dimensions, recorded per lot
Tolerance band±0.5 mm
Finishanodised
MOQ500 pieces per specification
Sampling10 working days, 5 days per revision
ComplianceISO/TS 16949

How the example is built up

  1. Start from the duty cycle, not from the catalogue photograph.
  2. Fix the base material in writing — Ceramic Composite, in this example.
  3. List the dimensions that are actually controlled and the tolerance on each.
  4. Name the finish and what it has to survive.
  5. State the inspection level and who pays when a lot fails.

AC Receiver Drier example

Processes involved

  • ultrasonic cleaning
  • CNC machining
  • gravity casting
  • cold forging
  • surface grinding
  • anodising

Where this example applies

Programmes that run drilled and slotted most often specify this build for long-haul trucks. Related applications include boat trailers, aftermarket retail, dealership service, utility trailers, passenger cars.

Checks before packing

  • Dimensional report against the approved drawing.
  • AQL 1.5 sampling on the finished lot.
  • Finish inspection under agreed lighting.
  • Carton drop test on the first lot of a new packing specification.

Questions buyers ask

How long does sampling take?

Samples leave the factory in 10 working days, and each revision round adds about 5 days once you have seen the first piece.

Do you handle mixed containers?

Yes. Most programmes consolidate several part numbers into one container to keep freight sensible at 500 pieces per line.

What is the minimum order quantity?

The standard MOQ is 500 pieces per specification. Mixed sizes inside one shipment are accepted once the total reaches that figure.

How is packing specified?

Individual packing, inner box quantity and carton marking are confirmed at quotation stage so the cartons arrive ready for your warehouse.

Share a sample or a drawing and we will quote against a written specification, not against a photograph.

Online customer service
WeChat contact
Customer service
Scan code to add Wechat (same mobile phone number)
Telephone consultation
Back to top