Welcome to Auto, Motorcycle Parts & Accessories official website!

Car Door Assembly Specification Example for Construction Equipment: Off-Road Version

Source:Cross Section Otr Tire / Time:2026-09-18

Car Door Assembly Specification Example for Construction Equipment: Off-Road Version

This is a worked specification for car door assembly in a off-road version programme. It is the document we would send a buyer who asks what exactly they are getting: the material, the dimensions that are actually controlled, the finish, and the checks that happen before anything is packed.

The off-road version version exists because the duty cycle on construction equipment is not the same as on a showroom vehicle. Where the two are specified identically, something fails later — usually inconsistent hardness between lots.

Car Door Assembly

Example specification

ItemCar Door Assembly
ApplicationConstruction Equipment
VersionOff-Road Version
Base materialCeramic Composite
Controlled dimensions5 key dimensions, recorded per lot
Tolerance band±0.5 mm
Finishpainted
MOQ1,000 pieces per specification
Sampling14 working days, 5 days per revision
ComplianceRoHS

How the example is built up

  1. Start from the duty cycle, not from the catalogue photograph.
  2. Fix the base material in writing — Ceramic Composite, in this example.
  3. List the dimensions that are actually controlled and the tolerance on each.
  4. Name the finish and what it has to survive.
  5. State the inspection level and who pays when a lot fails.

Car Door Assembly example

Processes involved

  • die casting
  • heat treatment
  • shot blasting
  • gravity casting
  • cold forging
  • rubber vulcanisation

Where this example applies

Programmes that run off-road version most often specify this build for construction equipment. Related applications include city buses, trailer axles, delivery vans, rental motorcycles, camper conversions.

Checks before packing

  • Dimensional report against the approved drawing.
  • AQL 2.5 sampling on the finished lot.
  • Finish inspection under agreed lighting.
  • Carton drop test on the first lot of a new packing specification.

Questions buyers ask

How is packing specified?

Individual packing, inner box quantity and carton marking are confirmed at quotation stage so the cartons arrive ready for your warehouse.

How long does sampling take?

Samples leave the factory in 14 working days, and each revision round adds about 5 days once you have seen the first piece.

What testing is included?

Standard lots ship with dimensional and hardness reports. RoHS documentation is issued with the shipment when your market requires it.

What is the minimum order quantity?

The standard MOQ is 1000 pieces per specification. Mixed sizes inside one shipment are accepted once the total reaches that figure.

Tell us the model, the fitment and the quantity and we will hold a production slot for you.

Online customer service
WeChat contact
Customer service
Scan code to add Wechat (same mobile phone number)
Telephone consultation
Back to top