Forestry Tractor Tires Specification Example for Passenger Cars: Folding Type
Forestry Tractor Tires Specification Example for Passenger Cars: Folding Type
This is a worked specification for forestry tractor tires in a folding type programme. It is the document we would send a buyer who asks what exactly they are getting: the material, the dimensions that are actually controlled, the finish, and the checks that happen before anything is packed.
The folding type version exists because the duty cycle on passenger cars is not the same as on a showroom vehicle. Where the two are specified identically, something fails later — usually inconsistent hardness between lots.

Example specification
| Item | Forestry Tractor Tires |
|---|---|
| Application | Passenger Cars |
| Version | Folding Type |
| Base material | Carbon Fibre Composite |
| Controlled dimensions | 3 key dimensions, recorded per lot |
| Tolerance band | ±0.2 mm |
| Finish | powder coated |
| MOQ | 3,000 pieces per specification |
| Sampling | 7 working days, 5 days per revision |
| Compliance | ISO/TS 16949 |
How the example is built up
- Start from the duty cycle, not from the catalogue photograph.
- Fix the base material in writing — Carbon Fibre Composite, in this example.
- List the dimensions that are actually controlled and the tolerance on each.
- Name the finish and what it has to survive.
- State the inspection level and who pays when a lot fails.

Processes involved
- shot blasting
- powder coating
- assembly line testing
- laser cutting
- sintering
- surface grinding
Where this example applies
Programmes that run folding type most often specify this build for passenger cars. Related applications include aftermarket retail, emergency vehicles, dealership service, rental motorcycles, assembly programmes.
Checks before packing
- Dimensional report against the approved drawing.
- AQL 2.5 sampling on the finished lot.
- Finish inspection under agreed lighting.
- Carton drop test on the first lot of a new packing specification.
Questions buyers ask
Can the specification be held on file?
Yes. Once approved, the specification is recorded against your part number so a reorder reproduces the ISO/TS 16949-compliant build instead of a fresh interpretation.
What happens if a lot fails inspection?
The lot is re-inspected against the golden sample, and replacement pieces ship on the next available booking at our cost.
How long does sampling take?
Samples leave the factory in 7 working days, and each revision round adds about 5 days once you have seen the first piece.
What is the minimum order quantity?
The standard MOQ is 3000 pieces per specification. Mixed sizes inside one shipment are accepted once the total reaches that figure.
Send the part number, the annual volume and the target market, and we will come back with a specification and a sampling plan.



