Welcome to Auto, Motorcycle Parts & Accessories official website!

Vehicle Fault Code Reader Specification Example for Camper Conversions: Drilled and Slotted

Source:Brake System Sensor / Time:2026-09-18

Vehicle Fault Code Reader Specification Example for Camper Conversions: Drilled and Slotted

This is a worked specification for vehicle fault code reader in a drilled and slotted programme. It is the document we would send a buyer who asks what exactly they are getting: the material, the dimensions that are actually controlled, the finish, and the checks that happen before anything is packed.

The drilled and slotted version exists because the duty cycle on camper conversions is not the same as on a showroom vehicle. Where the two are specified identically, something fails later — usually premature wear on the first batch.

Vehicle Fault Code Reader

Example specification

ItemVehicle Fault Code Reader
ApplicationCamper Conversions
VersionDrilled and Slotted
Base materialBrass
Controlled dimensions5 key dimensions, recorded per lot
Tolerance band±0.2 mm
Finishzinc plated
MOQ500 pieces per specification
Sampling10 working days, 3 days per revision
ComplianceSAE J431

How the example is built up

  1. Start from the duty cycle, not from the catalogue photograph.
  2. Fix the base material in writing — Brass, in this example.
  3. List the dimensions that are actually controlled and the tolerance on each.
  4. Name the finish and what it has to survive.
  5. State the inspection level and who pays when a lot fails.

Vehicle Fault Code Reader example

Processes involved

  • ultrasonic cleaning
  • cold forging
  • electroplating
  • surface grinding
  • die casting
  • rubber vulcanisation

Where this example applies

Programmes that run drilled and slotted most often specify this build for camper conversions. Related applications include courier fleets, long-haul trucks, workshop replacements, three-wheelers, municipal fleets.

Checks before packing

  • Dimensional report against the approved drawing.
  • AQL 1.5 sampling on the finished lot.
  • Finish inspection under agreed lighting.
  • Carton drop test on the first lot of a new packing specification.

Questions buyers ask

What happens if a lot fails inspection?

The lot is re-inspected against the golden sample, and replacement pieces ship on the next available booking at our cost.

Can you match an existing sample?

Send a sample and we will reverse-engineer the specification, then produce a counter sample for approval before any bulk starts.

Do you handle mixed containers?

Yes. Most programmes consolidate several part numbers into one container to keep freight sensible at 500 pieces per line.

Can the specification be held on file?

Yes. Once approved, the specification is recorded against your part number so a reorder reproduces the SAE J431-compliant build instead of a fresh interpretation.

Send the specification you are working to and we will confirm what we can match, what we would change and why.

Online customer service
WeChat contact
Customer service
Scan code to add Wechat (same mobile phone number)
Telephone consultation
Back to top