Welcome to Auto, Motorcycle Parts & Accessories official website!

Engine Starter System Specification Example for Courier Fleets: Waterproof Version

Source:Cargo Lashing Ratchet Buckle / Time:2026-09-18

Engine Starter System Specification Example for Courier Fleets: Waterproof Version

This is a worked specification for engine starter system in a waterproof version programme. It is the document we would send a buyer who asks what exactly they are getting: the material, the dimensions that are actually controlled, the finish, and the checks that happen before anything is packed.

The waterproof version version exists because the duty cycle on courier fleets is not the same as on a showroom vehicle. Where the two are specified identically, something fails later — usually packing that arrived crushed at the port.

Engine Starter System

Example specification

ItemEngine Starter System
ApplicationCourier Fleets
VersionWaterproof Version
Base materialBronze
Controlled dimensions3 key dimensions, recorded per lot
Tolerance band±0.5 mm
Finishpainted
MOQ1,000 pieces per specification
Sampling14 working days, 5 days per revision
ComplianceSGS

How the example is built up

  1. Start from the duty cycle, not from the catalogue photograph.
  2. Fix the base material in writing — Bronze, in this example.
  3. List the dimensions that are actually controlled and the tolerance on each.
  4. Name the finish and what it has to survive.
  5. State the inspection level and who pays when a lot fails.

Engine Starter System example

Processes involved

  • powder coating
  • laser cutting
  • robot welding
  • heat treatment
  • surface grinding
  • precision stamping

Where this example applies

Programmes that run waterproof version most often specify this build for courier fleets. Related applications include workshop replacements, camper conversions, passenger cars, light trucks, emergency vehicles.

Checks before packing

  • Dimensional report against the approved drawing.
  • AQL 2.5 sampling on the finished lot.
  • Finish inspection under agreed lighting.
  • Carton drop test on the first lot of a new packing specification.

Questions buyers ask

What happens if a lot fails inspection?

The lot is re-inspected against the golden sample, and replacement pieces ship on the next available booking at our cost.

Do you handle mixed containers?

Yes. Most programmes consolidate several part numbers into one container to keep freight sensible at 1000 pieces per line.

How long does sampling take?

Samples leave the factory in 14 working days, and each revision round adds about 5 days once you have seen the first piece.

Can the specification be held on file?

Yes. Once approved, the specification is recorded against your part number so a reorder reproduces the SGS-compliant build instead of a fresh interpretation.

Send the specification you are working to and we will confirm what we can match, what we would change and why.

Online customer service
WeChat contact
Customer service
Scan code to add Wechat (same mobile phone number)
Telephone consultation
Back to top