Welcome to Auto, Motorcycle Parts & Accessories official website!

Off-Road LED Bar Specification Example for Off-Road Bikes: All-Weather Version

Source:Car Cooling System / Time:2026-09-18

Off-Road LED Bar Specification Example for Off-Road Bikes: All-Weather Version

This is a worked specification for off-road led bar in a all-weather version programme. It is the document we would send a buyer who asks what exactly they are getting: the material, the dimensions that are actually controlled, the finish, and the checks that happen before anything is packed.

The all-weather version version exists because the duty cycle on off-road bikes is not the same as on a showroom vehicle. Where the two are specified identically, something fails later — usually a specification nobody had written down.

Off-Road LED Bar

Example specification

ItemOff-Road LED Bar
ApplicationOff-Road Bikes
VersionAll-Weather Version
Base materialHigh Density Foam
Controlled dimensions3 key dimensions, recorded per lot
Tolerance band±0.5 mm
Finishpowder coated
MOQ200 pieces per specification
Sampling10 working days, 3 days per revision
ComplianceRoHS

How the example is built up

  1. Start from the duty cycle, not from the catalogue photograph.
  2. Fix the base material in writing — High Density Foam, in this example.
  3. List the dimensions that are actually controlled and the tolerance on each.
  4. Name the finish and what it has to survive.
  5. State the inspection level and who pays when a lot fails.

Off-Road LED Bar example

Processes involved

  • laser cutting
  • rubber vulcanisation
  • precision stamping
  • CNC machining
  • injection moulding
  • robot welding

Where this example applies

Programmes that run all-weather version most often specify this build for off-road bikes. Related applications include long-haul trucks, three-wheelers, camper conversions, passenger cars, construction equipment.

Checks before packing

  • Dimensional report against the approved drawing.
  • AQL 4.0 sampling on the finished lot.
  • Finish inspection under agreed lighting.
  • Carton drop test on the first lot of a new packing specification.

Questions buyers ask

How is packing specified?

Individual packing, inner box quantity and carton marking are confirmed at quotation stage so the cartons arrive ready for your warehouse.

What happens if a lot fails inspection?

The lot is re-inspected against the golden sample, and replacement pieces ship on the next available booking at our cost.

How long does sampling take?

Samples leave the factory in 10 working days, and each revision round adds about 3 days once you have seen the first piece.

Can you match an existing sample?

Send a sample and we will reverse-engineer the specification, then produce a counter sample for approval before any bulk starts.

Send the part number, the annual volume and the target market, and we will come back with a specification and a sampling plan.

Online customer service
WeChat contact
Customer service
Scan code to add Wechat (same mobile phone number)
Telephone consultation
Back to top