Car Door Assembly Specification Example for Municipal Fleets: Budget Line
Car Door Assembly Specification Example for Municipal Fleets: Budget Line
This is a worked specification for car door assembly in a budget line programme. It is the document we would send a buyer who asks what exactly they are getting: the material, the dimensions that are actually controlled, the finish, and the checks that happen before anything is packed.
The budget line version exists because the duty cycle on municipal fleets is not the same as on a showroom vehicle. Where the two are specified identically, something fails later — usually a fitment that looked right on paper and failed on the bench.

Example specification
| Item | Car Door Assembly |
|---|---|
| Application | Municipal Fleets |
| Version | Budget Line |
| Base material | Powder Coated Steel |
| Controlled dimensions | 6 key dimensions, recorded per lot |
| Tolerance band | ±0.2 mm |
| Finish | anodised |
| MOQ | 500 pieces per specification |
| Sampling | 7 working days, 5 days per revision |
| Compliance | ISO/TS 16949 |
How the example is built up
- Start from the duty cycle, not from the catalogue photograph.
- Fix the base material in writing — Powder Coated Steel, in this example.
- List the dimensions that are actually controlled and the tolerance on each.
- Name the finish and what it has to survive.
- State the inspection level and who pays when a lot fails.

Processes involved
- gravity casting
- sintering
- shot blasting
- heat treatment
- injection moulding
- robot welding
Where this example applies
Programmes that run budget line most often specify this build for municipal fleets. Related applications include boat trailers, rental motorcycles, passenger cars, scooter fleets, off-road bikes.
Checks before packing
- Dimensional report against the approved drawing.
- AQL 4.0 sampling on the finished lot.
- Finish inspection under agreed lighting.
- Carton drop test on the first lot of a new packing specification.
Questions buyers ask
How long does sampling take?
Samples leave the factory in 7 working days, and each revision round adds about 5 days once you have seen the first piece.
What is the minimum order quantity?
The standard MOQ is 500 pieces per specification. Mixed sizes inside one shipment are accepted once the total reaches that figure.
What happens if a lot fails inspection?
The lot is re-inspected against the golden sample, and replacement pieces ship on the next available booking at our cost.
Can you match an existing sample?
Send a sample and we will reverse-engineer the specification, then produce a counter sample for approval before any bulk starts.
Share a sample or a drawing and we will quote against a written specification, not against a photograph.



