Intake Manifold Specification Example for Camper Conversions: Standard Replacement
Intake Manifold Specification Example for Camper Conversions: Standard Replacement
This is a worked specification for intake manifold in a standard replacement programme. It is the document we would send a buyer who asks what exactly they are getting: the material, the dimensions that are actually controlled, the finish, and the checks that happen before anything is packed.
The standard replacement version exists because the duty cycle on camper conversions is not the same as on a showroom vehicle. Where the two are specified identically, something fails later — usually reorders that did not match the approved sample.

Example specification
| Item | Intake Manifold |
|---|---|
| Application | Camper Conversions |
| Version | Standard Replacement |
| Base material | Carbon Fibre Composite |
| Controlled dimensions | 4 key dimensions, recorded per lot |
| Tolerance band | ±0.5 mm |
| Finish | powder coated |
| MOQ | 200 pieces per specification |
| Sampling | 7 working days, 5 days per revision |
| Compliance | ISO/TS 16949 |
How the example is built up
- Start from the duty cycle, not from the catalogue photograph.
- Fix the base material in writing — Carbon Fibre Composite, in this example.
- List the dimensions that are actually controlled and the tolerance on each.
- Name the finish and what it has to survive.
- State the inspection level and who pays when a lot fails.

Processes involved
- powder coating
- heat treatment
- electroplating
- rubber vulcanisation
- sintering
- anodising
Where this example applies
Programmes that run standard replacement most often specify this build for camper conversions. Related applications include boat trailers, fleet maintenance, camper conversions, construction equipment, off-road bikes.
Checks before packing
- Dimensional report against the approved drawing.
- AQL 4.0 sampling on the finished lot.
- Finish inspection under agreed lighting.
- Carton drop test on the first lot of a new packing specification.
Questions buyers ask
Can the specification be held on file?
Yes. Once approved, the specification is recorded against your part number so a reorder reproduces the ISO/TS 16949-compliant build instead of a fresh interpretation.
Can you match an existing sample?
Send a sample and we will reverse-engineer the specification, then produce a counter sample for approval before any bulk starts.
How long does sampling take?
Samples leave the factory in 7 working days, and each revision round adds about 5 days once you have seen the first piece.
What happens if a lot fails inspection?
The lot is re-inspected against the golden sample, and replacement pieces ship on the next available booking at our cost.
Send the specification you are working to and we will confirm what we can match, what we would change and why.



