Welcome to Auto, Motorcycle Parts & Accessories official website!

Phase Change Cooling System Specification Example for Three-Wheelers: Two-Piece Construction

Source:Car Audio System / Time:2026-09-18

Phase Change Cooling System Specification Example for Three-Wheelers: Two-Piece Construction

This is a worked specification for phase change cooling system in a two-piece construction programme. It is the document we would send a buyer who asks what exactly they are getting: the material, the dimensions that are actually controlled, the finish, and the checks that happen before anything is packed.

The two-piece construction version exists because the duty cycle on three-wheelers is not the same as on a showroom vehicle. Where the two are specified identically, something fails later — usually premature wear on the first batch.

Phase Change Cooling System

Example specification

ItemPhase Change Cooling System
ApplicationThree-Wheelers
VersionTwo-Piece Construction
Base materialSemi-Metallic Compound
Controlled dimensions3 key dimensions, recorded per lot
Tolerance band±0.2 mm
Finishpowder coated
MOQ3,000 pieces per specification
Sampling14 working days, 3 days per revision
ComplianceSAE J431

How the example is built up

  1. Start from the duty cycle, not from the catalogue photograph.
  2. Fix the base material in writing — Semi-Metallic Compound, in this example.
  3. List the dimensions that are actually controlled and the tolerance on each.
  4. Name the finish and what it has to survive.
  5. State the inspection level and who pays when a lot fails.

Phase Change Cooling System example

Processes involved

  • cold forging
  • shot blasting
  • injection moulding
  • CNC machining
  • anodising
  • gravity casting

Where this example applies

Programmes that run two-piece construction most often specify this build for three-wheelers. Related applications include emergency vehicles, utility trailers, construction equipment, export programmes, city buses.

Checks before packing

  • Dimensional report against the approved drawing.
  • AQL 2.5 sampling on the finished lot.
  • Finish inspection under agreed lighting.
  • Carton drop test on the first lot of a new packing specification.

Questions buyers ask

How long does sampling take?

Samples leave the factory in 14 working days, and each revision round adds about 3 days once you have seen the first piece.

What happens if a lot fails inspection?

The lot is re-inspected against the golden sample, and replacement pieces ship on the next available booking at our cost.

How is packing specified?

Individual packing, inner box quantity and carton marking are confirmed at quotation stage so the cartons arrive ready for your warehouse.

Can the specification be held on file?

Yes. Once approved, the specification is recorded against your part number so a reorder reproduces the SAE J431-compliant build instead of a fresh interpretation.

Tell us the model, the fitment and the quantity and we will hold a production slot for you.

Online customer service
WeChat contact
Customer service
Scan code to add Wechat (same mobile phone number)
Telephone consultation
Back to top