Steel Spoke Specification Example for Scooter Fleets: Off-Road Version
Steel Spoke Specification Example for Scooter Fleets: Off-Road Version
This is a worked specification for steel spoke in a off-road version programme. It is the document we would send a buyer who asks what exactly they are getting: the material, the dimensions that are actually controlled, the finish, and the checks that happen before anything is packed.
The off-road version version exists because the duty cycle on scooter fleets is not the same as on a showroom vehicle. Where the two are specified identically, something fails later — usually premature wear on the first batch.

Example specification
| Item | Steel Spoke |
|---|---|
| Application | Scooter Fleets |
| Version | Off-Road Version |
| Base material | Carbon Steel |
| Controlled dimensions | 4 key dimensions, recorded per lot |
| Tolerance band | ±0.05 mm |
| Finish | zinc plated |
| MOQ | 200 pieces per specification |
| Sampling | 14 working days, 5 days per revision |
| Compliance | E-mark |
How the example is built up
- Start from the duty cycle, not from the catalogue photograph.
- Fix the base material in writing — Carbon Steel, in this example.
- List the dimensions that are actually controlled and the tolerance on each.
- Name the finish and what it has to survive.
- State the inspection level and who pays when a lot fails.

Processes involved
- assembly line testing
- powder coating
- CNC machining
- shot blasting
- robot welding
- surface grinding
Where this example applies
Programmes that run off-road version most often specify this build for scooter fleets. Related applications include utility trailers, municipal fleets, courier fleets, passenger cars, three-wheelers.
Checks before packing
- Dimensional report against the approved drawing.
- AQL 2.5 sampling on the finished lot.
- Finish inspection under agreed lighting.
- Carton drop test on the first lot of a new packing specification.
Questions buyers ask
Do you handle mixed containers?
Yes. Most programmes consolidate several part numbers into one container to keep freight sensible at 200 pieces per line.
How long does sampling take?
Samples leave the factory in 14 working days, and each revision round adds about 5 days once you have seen the first piece.
Can the specification be held on file?
Yes. Once approved, the specification is recorded against your part number so a reorder reproduces the E-mark-compliant build instead of a fresh interpretation.
Can you match an existing sample?
Send a sample and we will reverse-engineer the specification, then produce a counter sample for approval before any bulk starts.
Share a sample or a drawing and we will quote against a written specification, not against a photograph.



