This is a worked specification for tubed tire in a lightweight version programme. It is the document we would send a buyer who asks what exactly they are getting: the material, the dimensions that are actually controlled, the finish, and the checks that happen before anything is packed.
The lightweight version version exists because the duty cycle on scooter fleets is not the same as on a showroom vehicle. Where the two are specified identically, something fails later — usually premature wear on the first batch.

Example specification
| Item | Tubed Tire |
|---|---|
| Application | Scooter Fleets |
| Version | Lightweight Version |
| Base material | Silicone |
| Controlled dimensions | 6 key dimensions, recorded per lot |
| Tolerance band | ±0.5 mm |
| Finish | as machined |
| MOQ | 1,000 pieces per specification |
| Sampling | 7 working days, 5 days per revision |
| Compliance | IATF 16949 |
How the example is built up
- Start from the duty cycle, not from the catalogue photograph.
- Fix the base material in writing — Silicone, in this example.
- List the dimensions that are actually controlled and the tolerance on each.
- Name the finish and what it has to survive.
- State the inspection level and who pays when a lot fails.

Processes involved
- CNC machining
- assembly line testing
- anodising
- cold forging
- precision stamping
- surface grinding
Where this example applies
Programmes that run lightweight version most often specify this build for scooter fleets. Related applications include three-wheelers, municipal fleets, passenger cars, long-haul trucks, city buses.
Checks before packing
- Dimensional report against the approved drawing.
- AQL 1.5 sampling on the finished lot.
- Finish inspection under agreed lighting.
- Carton drop test on the first lot of a new packing specification.
Questions buyers ask
Can the specification be held on file?
Yes. Once approved, the specification is recorded against your part number so a reorder reproduces the IATF 16949-compliant build instead of a fresh interpretation.
Can you match an existing sample?
Send a sample and we will reverse-engineer the specification, then produce a counter sample for approval before any bulk starts.
What is the minimum order quantity?
The standard MOQ is 1000 pieces per specification. Mixed sizes inside one shipment are accepted once the total reaches that figure.
Do you handle mixed containers?
Yes. Most programmes consolidate several part numbers into one container to keep freight sensible at 1000 pieces per line.