Welcome to Auto, Motorcycle Parts & Accessories official website!

Anti Theft Lock Specification Example for Workshop Replacements: Two-Piece Construction

Source:Leather Steering Wheel Grip / Time:2026-09-18

Anti Theft Lock Specification Example for Workshop Replacements: Two-Piece Construction

This is a worked specification for anti theft lock in a two-piece construction programme. It is the document we would send a buyer who asks what exactly they are getting: the material, the dimensions that are actually controlled, the finish, and the checks that happen before anything is packed.

The two-piece construction version exists because the duty cycle on workshop replacements is not the same as on a showroom vehicle. Where the two are specified identically, something fails later — usually documentation that arrived after the container shipped.

Anti Theft Lock

Example specification

ItemAnti Theft Lock
ApplicationWorkshop Replacements
VersionTwo-Piece Construction
Base materialKevlar Composite
Controlled dimensions6 key dimensions, recorded per lot
Tolerance band±0.2 mm
Finishpowder coated
MOQ200 pieces per specification
Sampling14 working days, 3 days per revision
ComplianceSGS

How the example is built up

  1. Start from the duty cycle, not from the catalogue photograph.
  2. Fix the base material in writing — Kevlar Composite, in this example.
  3. List the dimensions that are actually controlled and the tolerance on each.
  4. Name the finish and what it has to survive.
  5. State the inspection level and who pays when a lot fails.

Anti Theft Lock example

Processes involved

  • anodising
  • robot welding
  • gravity casting
  • shot blasting
  • sintering
  • CNC machining

Where this example applies

Programmes that run two-piece construction most often specify this build for workshop replacements. Related applications include aftermarket retail, light trucks, camper conversions, courier fleets, racing teams.

Checks before packing

  • Dimensional report against the approved drawing.
  • AQL 1.5 sampling on the finished lot.
  • Finish inspection under agreed lighting.
  • Carton drop test on the first lot of a new packing specification.

Questions buyers ask

What testing is included?

Standard lots ship with dimensional and hardness reports. SGS documentation is issued with the shipment when your market requires it.

Can you match an existing sample?

Send a sample and we will reverse-engineer the specification, then produce a counter sample for approval before any bulk starts.

How long does sampling take?

Samples leave the factory in 14 working days, and each revision round adds about 3 days once you have seen the first piece.

What happens if a lot fails inspection?

The lot is re-inspected against the golden sample, and replacement pieces ship on the next available booking at our cost.

Share a sample or a drawing and we will quote against a written specification, not against a photograph.

Online customer service
WeChat contact
Customer service
Scan code to add Wechat (same mobile phone number)
Telephone consultation
Back to top