Welcome to Auto, Motorcycle Parts & Accessories official website!

Racing Crankshaft Components Specification Example for Assembly Programmes: Waterproof Version

Source:Electric Power Steering System / Time:2026-09-18

Racing Crankshaft Components Specification Example for Assembly Programmes: Waterproof Version

This is a worked specification for racing crankshaft components in a waterproof version programme. It is the document we would send a buyer who asks what exactly they are getting: the material, the dimensions that are actually controlled, the finish, and the checks that happen before anything is packed.

The waterproof version version exists because the duty cycle on assembly programmes is not the same as on a showroom vehicle. Where the two are specified identically, something fails later — usually a fitment that looked right on paper and failed on the bench.

Racing Crankshaft Components

Example specification

ItemRacing Crankshaft Components
ApplicationAssembly Programmes
VersionWaterproof Version
Base materialTitanium Alloy
Controlled dimensions6 key dimensions, recorded per lot
Tolerance band±0.1 mm
Finishanodised
MOQ3,000 pieces per specification
Sampling14 working days, 5 days per revision
ComplianceREACH

How the example is built up

  1. Start from the duty cycle, not from the catalogue photograph.
  2. Fix the base material in writing — Titanium Alloy, in this example.
  3. List the dimensions that are actually controlled and the tolerance on each.
  4. Name the finish and what it has to survive.
  5. State the inspection level and who pays when a lot fails.

Racing Crankshaft Components example

Processes involved

  • electroplating
  • ultrasonic cleaning
  • surface grinding
  • rubber vulcanisation
  • powder coating
  • gravity casting

Where this example applies

Programmes that run waterproof version most often specify this build for assembly programmes. Related applications include camper conversions, passenger cars, delivery vans, construction equipment, city buses.

Checks before packing

  • Dimensional report against the approved drawing.
  • AQL 2.5 sampling on the finished lot.
  • Finish inspection under agreed lighting.
  • Carton drop test on the first lot of a new packing specification.

Questions buyers ask

How long does sampling take?

Samples leave the factory in 14 working days, and each revision round adds about 5 days once you have seen the first piece.

How is packing specified?

Individual packing, inner box quantity and carton marking are confirmed at quotation stage so the cartons arrive ready for your warehouse.

Can the specification be held on file?

Yes. Once approved, the specification is recorded against your part number so a reorder reproduces the REACH-compliant build instead of a fresh interpretation.

What happens if a lot fails inspection?

The lot is re-inspected against the golden sample, and replacement pieces ship on the next available booking at our cost.

Tell us the model, the fitment and the quantity and we will hold a production slot for you.

Online customer service
WeChat contact
Customer service
Scan code to add Wechat (same mobile phone number)
Telephone consultation
Back to top