AC Receiver Drier Specification Example for Trailer Axles: Touring Version
AC Receiver Drier Specification Example for Trailer Axles: Touring Version
This is a worked specification for ac receiver drier in a touring version programme. It is the document we would send a buyer who asks what exactly they are getting: the material, the dimensions that are actually controlled, the finish, and the checks that happen before anything is packed.
The touring version version exists because the duty cycle on trailer axles is not the same as on a showroom vehicle. Where the two are specified identically, something fails later — usually premature wear on the first batch.

Example specification
| Item | AC Receiver Drier |
|---|---|
| Application | Trailer Axles |
| Version | Touring Version |
| Base material | Nylon 66 |
| Controlled dimensions | 4 key dimensions, recorded per lot |
| Tolerance band | ±0.1 mm |
| Finish | anodised |
| MOQ | 500 pieces per specification |
| Sampling | 7 working days, 3 days per revision |
| Compliance | ECE R90 |
How the example is built up
- Start from the duty cycle, not from the catalogue photograph.
- Fix the base material in writing — Nylon 66, in this example.
- List the dimensions that are actually controlled and the tolerance on each.
- Name the finish and what it has to survive.
- State the inspection level and who pays when a lot fails.

Processes involved
- gravity casting
- laser cutting
- CNC machining
- assembly line testing
- cold forging
- surface grinding
Where this example applies
Programmes that run touring version most often specify this build for trailer axles. Related applications include aftermarket retail, racing teams, scooter fleets, agricultural trailers, rental motorcycles.
Checks before packing
- Dimensional report against the approved drawing.
- AQL 2.5 sampling on the finished lot.
- Finish inspection under agreed lighting.
- Carton drop test on the first lot of a new packing specification.
Questions buyers ask
What testing is included?
Standard lots ship with dimensional and hardness reports. ECE R90 documentation is issued with the shipment when your market requires it.
What happens if a lot fails inspection?
The lot is re-inspected against the golden sample, and replacement pieces ship on the next available booking at our cost.
How long does sampling take?
Samples leave the factory in 7 working days, and each revision round adds about 3 days once you have seen the first piece.
Do you handle mixed containers?
Yes. Most programmes consolidate several part numbers into one container to keep freight sensible at 500 pieces per line.
Ask for the current catalogue and the specification sheet for this line.



