Welcome to Auto, Motorcycle Parts & Accessories official website!

Otr Tire Truck Specification Example for Boat Trailers: Touring Version

Source:Fast Charging Vehicle Plug / Time:2026-09-18

Otr Tire Truck Specification Example for Boat Trailers: Touring Version

This is a worked specification for otr tire truck in a touring version programme. It is the document we would send a buyer who asks what exactly they are getting: the material, the dimensions that are actually controlled, the finish, and the checks that happen before anything is packed.

The touring version version exists because the duty cycle on boat trailers is not the same as on a showroom vehicle. Where the two are specified identically, something fails later — usually reorders that did not match the approved sample.

Otr Tire Truck

Example specification

ItemOtr Tire Truck
ApplicationBoat Trailers
VersionTouring Version
Base materialABS Plastic
Controlled dimensions6 key dimensions, recorded per lot
Tolerance band±0.1 mm
Finishanodised
MOQ200 pieces per specification
Sampling14 working days, 5 days per revision
ComplianceISO 9001

How the example is built up

  1. Start from the duty cycle, not from the catalogue photograph.
  2. Fix the base material in writing — ABS Plastic, in this example.
  3. List the dimensions that are actually controlled and the tolerance on each.
  4. Name the finish and what it has to survive.
  5. State the inspection level and who pays when a lot fails.

Otr Tire Truck example

Processes involved

  • assembly line testing
  • heat treatment
  • rubber vulcanisation
  • laser cutting
  • CNC machining
  • sintering

Where this example applies

Programmes that run touring version most often specify this build for boat trailers. Related applications include passenger cars, assembly programmes, rental motorcycles, utility trailers, fleet maintenance.

Checks before packing

  • Dimensional report against the approved drawing.
  • AQL 1.5 sampling on the finished lot.
  • Finish inspection under agreed lighting.
  • Carton drop test on the first lot of a new packing specification.

Questions buyers ask

What happens if a lot fails inspection?

The lot is re-inspected against the golden sample, and replacement pieces ship on the next available booking at our cost.

How long does sampling take?

Samples leave the factory in 14 working days, and each revision round adds about 5 days once you have seen the first piece.

Can you match an existing sample?

Send a sample and we will reverse-engineer the specification, then produce a counter sample for approval before any bulk starts.

What testing is included?

Standard lots ship with dimensional and hardness reports. ISO 9001 documentation is issued with the shipment when your market requires it.

Send the part number, the annual volume and the target market, and we will come back with a specification and a sampling plan.

Online customer service
WeChat contact
Customer service
Scan code to add Wechat (same mobile phone number)
Telephone consultation
Back to top