Sport Bumper Specification Example for Assembly Programmes: Heavy Duty
Sport Bumper Specification Example for Assembly Programmes: Heavy Duty
This is a worked specification for sport bumper in a heavy duty programme. It is the document we would send a buyer who asks what exactly they are getting: the material, the dimensions that are actually controlled, the finish, and the checks that happen before anything is packed.
The heavy duty version exists because the duty cycle on assembly programmes is not the same as on a showroom vehicle. Where the two are specified identically, something fails later — usually a specification nobody had written down.

Example specification
| Item | Sport Bumper |
|---|---|
| Application | Assembly Programmes |
| Version | Heavy Duty |
| Base material | Neoprene |
| Controlled dimensions | 5 key dimensions, recorded per lot |
| Tolerance band | ±0.5 mm |
| Finish | zinc plated |
| MOQ | 500 pieces per specification |
| Sampling | 7 working days, 5 days per revision |
| Compliance | ISO/TS 16949 |
How the example is built up
- Start from the duty cycle, not from the catalogue photograph.
- Fix the base material in writing — Neoprene, in this example.
- List the dimensions that are actually controlled and the tolerance on each.
- Name the finish and what it has to survive.
- State the inspection level and who pays when a lot fails.

Processes involved
- rubber vulcanisation
- electroplating
- cold forging
- precision stamping
- anodising
- heat treatment
Where this example applies
Programmes that run heavy duty most often specify this build for assembly programmes. Related applications include city buses, delivery vans, camper conversions, trailer axles, agricultural trailers.
Checks before packing
- Dimensional report against the approved drawing.
- AQL 2.5 sampling on the finished lot.
- Finish inspection under agreed lighting.
- Carton drop test on the first lot of a new packing specification.
Questions buyers ask
Can you match an existing sample?
Send a sample and we will reverse-engineer the specification, then produce a counter sample for approval before any bulk starts.
What testing is included?
Standard lots ship with dimensional and hardness reports. ISO/TS 16949 documentation is issued with the shipment when your market requires it.
What happens if a lot fails inspection?
The lot is re-inspected against the golden sample, and replacement pieces ship on the next available booking at our cost.
Can the specification be held on file?
Yes. Once approved, the specification is recorded against your part number so a reorder reproduces the ISO/TS 16949-compliant build instead of a fresh interpretation.
Ask for the current catalogue and the specification sheet for this line.



