Welcome to Auto, Motorcycle Parts & Accessories official website!

Electronic Stability Program Specification Example for Fleet Maintenance: Long Life Version

Source:Racing Crankshaft Components / Time:2026-09-18

Electronic Stability Program Specification Example for Fleet Maintenance: Long Life Version

This is a worked specification for electronic stability program in a long life version programme. It is the document we would send a buyer who asks what exactly they are getting: the material, the dimensions that are actually controlled, the finish, and the checks that happen before anything is packed.

The long life version version exists because the duty cycle on fleet maintenance is not the same as on a showroom vehicle. Where the two are specified identically, something fails later — usually inconsistent hardness between lots.

Electronic Stability Program

Example specification

ItemElectronic Stability Program
ApplicationFleet Maintenance
VersionLong Life Version
Base materialNatural Rubber
Controlled dimensions6 key dimensions, recorded per lot
Tolerance band±0.2 mm
Finishanodised
MOQ200 pieces per specification
Sampling14 working days, 5 days per revision
ComplianceIATF 16949

How the example is built up

  1. Start from the duty cycle, not from the catalogue photograph.
  2. Fix the base material in writing — Natural Rubber, in this example.
  3. List the dimensions that are actually controlled and the tolerance on each.
  4. Name the finish and what it has to survive.
  5. State the inspection level and who pays when a lot fails.

Electronic Stability Program example

Processes involved

  • sintering
  • electroplating
  • shot blasting
  • rubber vulcanisation
  • surface grinding
  • powder coating

Where this example applies

Programmes that run long life version most often specify this build for fleet maintenance. Related applications include rental motorcycles, fleet maintenance, passenger cars, camper conversions, off-road bikes.

Checks before packing

  • Dimensional report against the approved drawing.
  • AQL 2.5 sampling on the finished lot.
  • Finish inspection under agreed lighting.
  • Carton drop test on the first lot of a new packing specification.

Questions buyers ask

Can the specification be held on file?

Yes. Once approved, the specification is recorded against your part number so a reorder reproduces the IATF 16949-compliant build instead of a fresh interpretation.

How long does sampling take?

Samples leave the factory in 14 working days, and each revision round adds about 5 days once you have seen the first piece.

Can you match an existing sample?

Send a sample and we will reverse-engineer the specification, then produce a counter sample for approval before any bulk starts.

How is packing specified?

Individual packing, inner box quantity and carton marking are confirmed at quotation stage so the cartons arrive ready for your warehouse.

Tell us the model, the fitment and the quantity and we will hold a production slot for you.

Online customer service
WeChat contact
Customer service
Scan code to add Wechat (same mobile phone number)
Telephone consultation
Back to top