Otr Tire Tools Specification Example for Light Trucks: Drilled and Slotted
Otr Tire Tools Specification Example for Light Trucks: Drilled and Slotted
This is a worked specification for otr tire tools in a drilled and slotted programme. It is the document we would send a buyer who asks what exactly they are getting: the material, the dimensions that are actually controlled, the finish, and the checks that happen before anything is packed.
The drilled and slotted version exists because the duty cycle on light trucks is not the same as on a showroom vehicle. Where the two are specified identically, something fails later — usually premature wear on the first batch.

Example specification
| Item | Otr Tire Tools |
|---|---|
| Application | Light Trucks |
| Version | Drilled and Slotted |
| Base material | Zinc Plated Steel |
| Controlled dimensions | 5 key dimensions, recorded per lot |
| Tolerance band | ±0.05 mm |
| Finish | powder coated |
| MOQ | 3,000 pieces per specification |
| Sampling | 7 working days, 5 days per revision |
| Compliance | DOT |
How the example is built up
- Start from the duty cycle, not from the catalogue photograph.
- Fix the base material in writing — Zinc Plated Steel, in this example.
- List the dimensions that are actually controlled and the tolerance on each.
- Name the finish and what it has to survive.
- State the inspection level and who pays when a lot fails.

Processes involved
- gravity casting
- die casting
- injection moulding
- sintering
- CNC machining
- heat treatment
Where this example applies
Programmes that run drilled and slotted most often specify this build for light trucks. Related applications include aftermarket retail, utility trailers, delivery vans, municipal fleets, off-road bikes.
Checks before packing
- Dimensional report against the approved drawing.
- AQL 4.0 sampling on the finished lot.
- Finish inspection under agreed lighting.
- Carton drop test on the first lot of a new packing specification.
Questions buyers ask
What testing is included?
Standard lots ship with dimensional and hardness reports. DOT documentation is issued with the shipment when your market requires it.
What is the minimum order quantity?
The standard MOQ is 3000 pieces per specification. Mixed sizes inside one shipment are accepted once the total reaches that figure.
How long does sampling take?
Samples leave the factory in 7 working days, and each revision round adds about 5 days once you have seen the first piece.
Can you match an existing sample?
Send a sample and we will reverse-engineer the specification, then produce a counter sample for approval before any bulk starts.
Ask for the current catalogue and the specification sheet for this line.