Welcome to Auto, Motorcycle Parts & Accessories official website!

Air Conditioning Filter Drier Specification Example for Workshop Replacements: Lightweight Version

Source:Mechanical Coupling / Time:2026-09-18

Air Conditioning Filter Drier Specification Example for Workshop Replacements: Lightweight Version

This is a worked specification for air conditioning filter drier in a lightweight version programme. It is the document we would send a buyer who asks what exactly they are getting: the material, the dimensions that are actually controlled, the finish, and the checks that happen before anything is packed.

The lightweight version version exists because the duty cycle on workshop replacements is not the same as on a showroom vehicle. Where the two are specified identically, something fails later — usually lead time that slipped twice before bulk started.

Air Conditioning Filter Drier

Example specification

ItemAir Conditioning Filter Drier
ApplicationWorkshop Replacements
VersionLightweight Version
Base materialBronze
Controlled dimensions6 key dimensions, recorded per lot
Tolerance band±0.1 mm
Finishas machined
MOQ2,000 pieces per specification
Sampling10 working days, 3 days per revision
ComplianceREACH

How the example is built up

  1. Start from the duty cycle, not from the catalogue photograph.
  2. Fix the base material in writing — Bronze, in this example.
  3. List the dimensions that are actually controlled and the tolerance on each.
  4. Name the finish and what it has to survive.
  5. State the inspection level and who pays when a lot fails.

Air Conditioning Filter Drier example

Processes involved

  • shot blasting
  • powder coating
  • CNC machining
  • assembly line testing
  • anodising
  • ultrasonic cleaning

Where this example applies

Programmes that run lightweight version most often specify this build for workshop replacements. Related applications include passenger cars, utility trailers, workshop replacements, off-road bikes, scooter fleets.

Checks before packing

  • Dimensional report against the approved drawing.
  • AQL 4.0 sampling on the finished lot.
  • Finish inspection under agreed lighting.
  • Carton drop test on the first lot of a new packing specification.

Questions buyers ask

What happens if a lot fails inspection?

The lot is re-inspected against the golden sample, and replacement pieces ship on the next available booking at our cost.

How long does sampling take?

Samples leave the factory in 10 working days, and each revision round adds about 3 days once you have seen the first piece.

Do you handle mixed containers?

Yes. Most programmes consolidate several part numbers into one container to keep freight sensible at 2000 pieces per line.

What testing is included?

Standard lots ship with dimensional and hardness reports. REACH documentation is issued with the shipment when your market requires it.

Send the part number, the annual volume and the target market, and we will come back with a specification and a sampling plan.

Online customer service
WeChat contact
Customer service
Scan code to add Wechat (same mobile phone number)
Telephone consultation
Back to top