Welcome to Auto, Motorcycle Parts & Accessories official website!

Engine Starter System Specification Example for Fleet Maintenance: All-Weather Version

Source:Magnetic Car Phone Holder / Time:2026-09-18

Engine Starter System Specification Example for Fleet Maintenance: All-Weather Version

This is a worked specification for engine starter system in a all-weather version programme. It is the document we would send a buyer who asks what exactly they are getting: the material, the dimensions that are actually controlled, the finish, and the checks that happen before anything is packed.

The all-weather version version exists because the duty cycle on fleet maintenance is not the same as on a showroom vehicle. Where the two are specified identically, something fails later — usually a supplier who changed material without saying so.

Engine Starter System

Example specification

ItemEngine Starter System
ApplicationFleet Maintenance
VersionAll-Weather Version
Base materialPolypropylene
Controlled dimensions5 key dimensions, recorded per lot
Tolerance band±0.5 mm
Finishas machined
MOQ500 pieces per specification
Sampling10 working days, 3 days per revision
ComplianceCCC

How the example is built up

  1. Start from the duty cycle, not from the catalogue photograph.
  2. Fix the base material in writing — Polypropylene, in this example.
  3. List the dimensions that are actually controlled and the tolerance on each.
  4. Name the finish and what it has to survive.
  5. State the inspection level and who pays when a lot fails.

Engine Starter System example

Processes involved

  • surface grinding
  • heat treatment
  • anodising
  • shot blasting
  • rubber vulcanisation
  • sintering

Where this example applies

Programmes that run all-weather version most often specify this build for fleet maintenance. Related applications include city buses, boat trailers, scooter fleets, three-wheelers, light trucks.

Checks before packing

  • Dimensional report against the approved drawing.
  • AQL 4.0 sampling on the finished lot.
  • Finish inspection under agreed lighting.
  • Carton drop test on the first lot of a new packing specification.

Questions buyers ask

How is packing specified?

Individual packing, inner box quantity and carton marking are confirmed at quotation stage so the cartons arrive ready for your warehouse.

Can you match an existing sample?

Send a sample and we will reverse-engineer the specification, then produce a counter sample for approval before any bulk starts.

What happens if a lot fails inspection?

The lot is re-inspected against the golden sample, and replacement pieces ship on the next available booking at our cost.

How long does sampling take?

Samples leave the factory in 10 working days, and each revision round adds about 3 days once you have seen the first piece.

Send the part number, the annual volume and the target market, and we will come back with a specification and a sampling plan.

Online customer service
WeChat contact
Customer service
Scan code to add Wechat (same mobile phone number)
Telephone consultation
Back to top