Daytime Running Light Specification Example for Long-Haul Trucks: Long Life Version
Daytime Running Light Specification Example for Long-Haul Trucks: Long Life Version
This is a worked specification for daytime running light in a long life version programme. It is the document we would send a buyer who asks what exactly they are getting: the material, the dimensions that are actually controlled, the finish, and the checks that happen before anything is packed.
The long life version version exists because the duty cycle on long-haul trucks is not the same as on a showroom vehicle. Where the two are specified identically, something fails later — usually warranty claims traced back to a single lot.

Example specification
| Item | Daytime Running Light |
|---|---|
| Application | Long-Haul Trucks |
| Version | Long Life Version |
| Base material | Powder Coated Steel |
| Controlled dimensions | 4 key dimensions, recorded per lot |
| Tolerance band | ±0.2 mm |
| Finish | as machined |
| MOQ | 1,000 pieces per specification |
| Sampling | 7 working days, 3 days per revision |
| Compliance | DOT |
How the example is built up
- Start from the duty cycle, not from the catalogue photograph.
- Fix the base material in writing — Powder Coated Steel, in this example.
- List the dimensions that are actually controlled and the tolerance on each.
- Name the finish and what it has to survive.
- State the inspection level and who pays when a lot fails.

Processes involved
- cold forging
- precision stamping
- gravity casting
- rubber vulcanisation
- laser cutting
- injection moulding
Where this example applies
Programmes that run long life version most often specify this build for long-haul trucks. Related applications include utility trailers, construction equipment, workshop replacements, trailer axles, passenger cars.
Checks before packing
- Dimensional report against the approved drawing.
- AQL 2.5 sampling on the finished lot.
- Finish inspection under agreed lighting.
- Carton drop test on the first lot of a new packing specification.
Questions buyers ask
How is packing specified?
Individual packing, inner box quantity and carton marking are confirmed at quotation stage so the cartons arrive ready for your warehouse.
What is the minimum order quantity?
The standard MOQ is 1000 pieces per specification. Mixed sizes inside one shipment are accepted once the total reaches that figure.
Can you match an existing sample?
Send a sample and we will reverse-engineer the specification, then produce a counter sample for approval before any bulk starts.
How long does sampling take?
Samples leave the factory in 7 working days, and each revision round adds about 3 days once you have seen the first piece.
Share a sample or a drawing and we will quote against a written specification, not against a photograph.



