Welcome to Auto, Motorcycle Parts & Accessories official website!

Fuel Cooling System Specification Example for Municipal Fleets: Two-Piece Construction

Source:Car AC Compressor / Time:2026-09-18

Fuel Cooling System Specification Example for Municipal Fleets: Two-Piece Construction

This is a worked specification for fuel cooling system in a two-piece construction programme. It is the document we would send a buyer who asks what exactly they are getting: the material, the dimensions that are actually controlled, the finish, and the checks that happen before anything is packed.

The two-piece construction version exists because the duty cycle on municipal fleets is not the same as on a showroom vehicle. Where the two are specified identically, something fails later — usually premature wear on the first batch.

Fuel Cooling System

Example specification

ItemFuel Cooling System
ApplicationMunicipal Fleets
VersionTwo-Piece Construction
Base materialChromed Steel
Controlled dimensions6 key dimensions, recorded per lot
Tolerance band±0.1 mm
Finishpowder coated
MOQ200 pieces per specification
Sampling7 working days, 5 days per revision
ComplianceECE R90

How the example is built up

  1. Start from the duty cycle, not from the catalogue photograph.
  2. Fix the base material in writing — Chromed Steel, in this example.
  3. List the dimensions that are actually controlled and the tolerance on each.
  4. Name the finish and what it has to survive.
  5. State the inspection level and who pays when a lot fails.

Fuel Cooling System example

Processes involved

  • shot blasting
  • heat treatment
  • rubber vulcanisation
  • surface grinding
  • electroplating
  • cold forging

Where this example applies

Programmes that run two-piece construction most often specify this build for municipal fleets. Related applications include passenger cars, off-road bikes, emergency vehicles, camper conversions, scooter fleets.

Checks before packing

  • Dimensional report against the approved drawing.
  • AQL 1.5 sampling on the finished lot.
  • Finish inspection under agreed lighting.
  • Carton drop test on the first lot of a new packing specification.

Questions buyers ask

Do you handle mixed containers?

Yes. Most programmes consolidate several part numbers into one container to keep freight sensible at 200 pieces per line.

How long does sampling take?

Samples leave the factory in 7 working days, and each revision round adds about 5 days once you have seen the first piece.

Can the specification be held on file?

Yes. Once approved, the specification is recorded against your part number so a reorder reproduces the ECE R90-compliant build instead of a fresh interpretation.

Can you match an existing sample?

Send a sample and we will reverse-engineer the specification, then produce a counter sample for approval before any bulk starts.

Share a sample or a drawing and we will quote against a written specification, not against a photograph.

Online customer service
WeChat contact
Customer service
Scan code to add Wechat (same mobile phone number)
Telephone consultation
Back to top