Welcome to Auto, Motorcycle Parts & Accessories official website!

Tire Balancing Machine Specification Example for Emergency Vehicles: Two-Piece Construction

Source:Hydraulic Piston / Time:2026-09-18

Tire Balancing Machine Specification Example for Emergency Vehicles: Two-Piece Construction

This is a worked specification for tire balancing machine in a two-piece construction programme. It is the document we would send a buyer who asks what exactly they are getting: the material, the dimensions that are actually controlled, the finish, and the checks that happen before anything is packed.

The two-piece construction version exists because the duty cycle on emergency vehicles is not the same as on a showroom vehicle. Where the two are specified identically, something fails later — usually documentation that arrived after the container shipped.

Tire Balancing Machine

Example specification

ItemTire Balancing Machine
ApplicationEmergency Vehicles
VersionTwo-Piece Construction
Base materialTempered Glass
Controlled dimensions4 key dimensions, recorded per lot
Tolerance band±0.2 mm
Finishpowder coated
MOQ500 pieces per specification
Sampling10 working days, 3 days per revision
ComplianceISO/TS 16949

How the example is built up

  1. Start from the duty cycle, not from the catalogue photograph.
  2. Fix the base material in writing — Tempered Glass, in this example.
  3. List the dimensions that are actually controlled and the tolerance on each.
  4. Name the finish and what it has to survive.
  5. State the inspection level and who pays when a lot fails.

Tire Balancing Machine example

Processes involved

  • assembly line testing
  • electroplating
  • shot blasting
  • cold forging
  • precision stamping
  • robot welding

Where this example applies

Programmes that run two-piece construction most often specify this build for emergency vehicles. Related applications include agricultural trailers, courier fleets, scooter fleets, export programmes, passenger cars.

Checks before packing

  • Dimensional report against the approved drawing.
  • AQL 1.5 sampling on the finished lot.
  • Finish inspection under agreed lighting.
  • Carton drop test on the first lot of a new packing specification.

Questions buyers ask

How long does sampling take?

Samples leave the factory in 10 working days, and each revision round adds about 3 days once you have seen the first piece.

How is packing specified?

Individual packing, inner box quantity and carton marking are confirmed at quotation stage so the cartons arrive ready for your warehouse.

What testing is included?

Standard lots ship with dimensional and hardness reports. ISO/TS 16949 documentation is issued with the shipment when your market requires it.

Can the specification be held on file?

Yes. Once approved, the specification is recorded against your part number so a reorder reproduces the ISO/TS 16949-compliant build instead of a fresh interpretation.

Share a sample or a drawing and we will quote against a written specification, not against a photograph.

Online customer service
WeChat contact
Customer service
Scan code to add Wechat (same mobile phone number)
Telephone consultation
Back to top