Welcome to Auto, Motorcycle Parts & Accessories official website!

Tubed Tire Specification Example for Light Trucks: Two-Piece Construction

Source:Injection Valves / Time:2026-09-18

Tubed Tire Specification Example for Light Trucks: Two-Piece Construction

This is a worked specification for tubed tire in a two-piece construction programme. It is the document we would send a buyer who asks what exactly they are getting: the material, the dimensions that are actually controlled, the finish, and the checks that happen before anything is packed.

The two-piece construction version exists because the duty cycle on light trucks is not the same as on a showroom vehicle. Where the two are specified identically, something fails later — usually a specification nobody had written down.

Tubed Tire

Example specification

ItemTubed Tire
ApplicationLight Trucks
VersionTwo-Piece Construction
Base materialSilicone
Controlled dimensions3 key dimensions, recorded per lot
Tolerance band±0.2 mm
Finishpowder coated
MOQ1,000 pieces per specification
Sampling10 working days, 5 days per revision
ComplianceISO 9001

How the example is built up

  1. Start from the duty cycle, not from the catalogue photograph.
  2. Fix the base material in writing — Silicone, in this example.
  3. List the dimensions that are actually controlled and the tolerance on each.
  4. Name the finish and what it has to survive.
  5. State the inspection level and who pays when a lot fails.

Tubed Tire example

Processes involved

  • CNC machining
  • die casting
  • shot blasting
  • ultrasonic cleaning
  • gravity casting
  • robot welding

Where this example applies

Programmes that run two-piece construction most often specify this build for light trucks. Related applications include assembly programmes, long-haul trucks, racing teams, scooter fleets, agricultural trailers.

Checks before packing

  • Dimensional report against the approved drawing.
  • AQL 2.5 sampling on the finished lot.
  • Finish inspection under agreed lighting.
  • Carton drop test on the first lot of a new packing specification.

Questions buyers ask

What happens if a lot fails inspection?

The lot is re-inspected against the golden sample, and replacement pieces ship on the next available booking at our cost.

What testing is included?

Standard lots ship with dimensional and hardness reports. ISO 9001 documentation is issued with the shipment when your market requires it.

What is the minimum order quantity?

The standard MOQ is 1000 pieces per specification. Mixed sizes inside one shipment are accepted once the total reaches that figure.

How long does sampling take?

Samples leave the factory in 10 working days, and each revision round adds about 5 days once you have seen the first piece.

Ask for the current catalogue and the specification sheet for this line.

Online customer service
WeChat contact
Customer service
Scan code to add Wechat (same mobile phone number)
Telephone consultation
Back to top