AC Receiver Drier Specification Example for Off-Road Bikes: Fixed Type
AC Receiver Drier Specification Example for Off-Road Bikes: Fixed Type
This is a worked specification for ac receiver drier in a fixed type programme. It is the document we would send a buyer who asks what exactly they are getting: the material, the dimensions that are actually controlled, the finish, and the checks that happen before anything is packed.
The fixed type version exists because the duty cycle on off-road bikes is not the same as on a showroom vehicle. Where the two are specified identically, something fails later — usually a supplier who changed material without saying so.

Example specification
| Item | AC Receiver Drier |
|---|---|
| Application | Off-Road Bikes |
| Version | Fixed Type |
| Base material | Nylon 66 |
| Controlled dimensions | 3 key dimensions, recorded per lot |
| Tolerance band | ±0.1 mm |
| Finish | powder coated |
| MOQ | 200 pieces per specification |
| Sampling | 10 working days, 3 days per revision |
| Compliance | ECE R90 |
How the example is built up
- Start from the duty cycle, not from the catalogue photograph.
- Fix the base material in writing — Nylon 66, in this example.
- List the dimensions that are actually controlled and the tolerance on each.
- Name the finish and what it has to survive.
- State the inspection level and who pays when a lot fails.

Processes involved
- cold forging
- precision stamping
- powder coating
- electroplating
- die casting
- sintering
Where this example applies
Programmes that run fixed type most often specify this build for off-road bikes. Related applications include agricultural trailers, three-wheelers, fleet maintenance, municipal fleets, light trucks.
Checks before packing
- Dimensional report against the approved drawing.
- AQL 4.0 sampling on the finished lot.
- Finish inspection under agreed lighting.
- Carton drop test on the first lot of a new packing specification.
Questions buyers ask
What is the minimum order quantity?
The standard MOQ is 200 pieces per specification. Mixed sizes inside one shipment are accepted once the total reaches that figure.
What testing is included?
Standard lots ship with dimensional and hardness reports. ECE R90 documentation is issued with the shipment when your market requires it.
How is packing specified?
Individual packing, inner box quantity and carton marking are confirmed at quotation stage so the cartons arrive ready for your warehouse.
What happens if a lot fails inspection?
The lot is re-inspected against the golden sample, and replacement pieces ship on the next available booking at our cost.
Send the specification you are working to and we will confirm what we can match, what we would change and why.



