Heat Rejection Tint Specification Example for Emergency Vehicles: Vented Design
Heat Rejection Tint Specification Example for Emergency Vehicles: Vented Design
This is a worked specification for heat rejection tint in a vented design programme. It is the document we would send a buyer who asks what exactly they are getting: the material, the dimensions that are actually controlled, the finish, and the checks that happen before anything is packed.
The vented design version exists because the duty cycle on emergency vehicles is not the same as on a showroom vehicle. Where the two are specified identically, something fails later — usually lead time that slipped twice before bulk started.

Example specification
| Item | Heat Rejection Tint |
|---|---|
| Application | Emergency Vehicles |
| Version | Vented Design |
| Base material | Magnesium Alloy |
| Controlled dimensions | 4 key dimensions, recorded per lot |
| Tolerance band | ±0.1 mm |
| Finish | powder coated |
| MOQ | 1,000 pieces per specification |
| Sampling | 7 working days, 3 days per revision |
| Compliance | ECE R90 |
How the example is built up
- Start from the duty cycle, not from the catalogue photograph.
- Fix the base material in writing — Magnesium Alloy, in this example.
- List the dimensions that are actually controlled and the tolerance on each.
- Name the finish and what it has to survive.
- State the inspection level and who pays when a lot fails.

Processes involved
- laser cutting
- die casting
- sintering
- robot welding
- assembly line testing
- rubber vulcanisation
Where this example applies
Programmes that run vented design most often specify this build for emergency vehicles. Related applications include workshop replacements, dealership service, delivery vans, city buses, trailer axles.
Checks before packing
- Dimensional report against the approved drawing.
- AQL 1.5 sampling on the finished lot.
- Finish inspection under agreed lighting.
- Carton drop test on the first lot of a new packing specification.
Questions buyers ask
Can the specification be held on file?
Yes. Once approved, the specification is recorded against your part number so a reorder reproduces the ECE R90-compliant build instead of a fresh interpretation.
How is packing specified?
Individual packing, inner box quantity and carton marking are confirmed at quotation stage so the cartons arrive ready for your warehouse.
What is the minimum order quantity?
The standard MOQ is 1000 pieces per specification. Mixed sizes inside one shipment are accepted once the total reaches that figure.
What happens if a lot fails inspection?
The lot is re-inspected against the golden sample, and replacement pieces ship on the next available booking at our cost.
Tell us the model, the fitment and the quantity and we will hold a production slot for you.



