Kfs Auto Bearing Specification Example for Export Programmes: Quick Fit Version
Kfs Auto Bearing Specification Example for Export Programmes: Quick Fit Version
This is a worked specification for kfs auto bearing in a quick fit version programme. It is the document we would send a buyer who asks what exactly they are getting: the material, the dimensions that are actually controlled, the finish, and the checks that happen before anything is packed.
The quick fit version version exists because the duty cycle on export programmes is not the same as on a showroom vehicle. Where the two are specified identically, something fails later — usually warranty claims traced back to a single lot.

Example specification
| Item | Kfs Auto Bearing |
|---|---|
| Application | Export Programmes |
| Version | Quick Fit Version |
| Base material | Brass |
| Controlled dimensions | 3 key dimensions, recorded per lot |
| Tolerance band | ±0.5 mm |
| Finish | painted |
| MOQ | 2,000 pieces per specification |
| Sampling | 7 working days, 3 days per revision |
| Compliance | IATF 16949 |
How the example is built up
- Start from the duty cycle, not from the catalogue photograph.
- Fix the base material in writing — Brass, in this example.
- List the dimensions that are actually controlled and the tolerance on each.
- Name the finish and what it has to survive.
- State the inspection level and who pays when a lot fails.

Processes involved
- powder coating
- laser cutting
- surface grinding
- precision stamping
- ultrasonic cleaning
- robot welding
Where this example applies
Programmes that run quick fit version most often specify this build for export programmes. Related applications include delivery vans, emergency vehicles, agricultural trailers, assembly programmes, racing teams.
Checks before packing
- Dimensional report against the approved drawing.
- AQL 1.5 sampling on the finished lot.
- Finish inspection under agreed lighting.
- Carton drop test on the first lot of a new packing specification.
Questions buyers ask
What happens if a lot fails inspection?
The lot is re-inspected against the golden sample, and replacement pieces ship on the next available booking at our cost.
What testing is included?
Standard lots ship with dimensional and hardness reports. IATF 16949 documentation is issued with the shipment when your market requires it.
What is the minimum order quantity?
The standard MOQ is 2000 pieces per specification. Mixed sizes inside one shipment are accepted once the total reaches that figure.
How long does sampling take?
Samples leave the factory in 7 working days, and each revision round adds about 3 days once you have seen the first piece.
Share a sample or a drawing and we will quote against a written specification, not against a photograph.