Forged Rim Specification Example for Workshop Replacements: Drilled and Slotted
Forged Rim Specification Example for Workshop Replacements: Drilled and Slotted
This is a worked specification for forged rim in a drilled and slotted programme. It is the document we would send a buyer who asks what exactly they are getting: the material, the dimensions that are actually controlled, the finish, and the checks that happen before anything is packed.
The drilled and slotted version exists because the duty cycle on workshop replacements is not the same as on a showroom vehicle. Where the two are specified identically, something fails later — usually a specification nobody had written down.

Example specification
| Item | Forged Rim |
|---|---|
| Application | Workshop Replacements |
| Version | Drilled and Slotted |
| Base material | Carbon Fibre Composite |
| Controlled dimensions | 6 key dimensions, recorded per lot |
| Tolerance band | ±0.2 mm |
| Finish | as machined |
| MOQ | 200 pieces per specification |
| Sampling | 14 working days, 5 days per revision |
| Compliance | IATF 16949 |
How the example is built up
- Start from the duty cycle, not from the catalogue photograph.
- Fix the base material in writing — Carbon Fibre Composite, in this example.
- List the dimensions that are actually controlled and the tolerance on each.
- Name the finish and what it has to survive.
- State the inspection level and who pays when a lot fails.
![]()
Processes involved
- electroplating
- robot welding
- injection moulding
- assembly line testing
- die casting
- shot blasting
Where this example applies
Programmes that run drilled and slotted most often specify this build for workshop replacements. Related applications include trailer axles, fleet maintenance, three-wheelers, workshop replacements, boat trailers.
Checks before packing
- Dimensional report against the approved drawing.
- AQL 2.5 sampling on the finished lot.
- Finish inspection under agreed lighting.
- Carton drop test on the first lot of a new packing specification.
Questions buyers ask
How long does sampling take?
Samples leave the factory in 14 working days, and each revision round adds about 5 days once you have seen the first piece.
What testing is included?
Standard lots ship with dimensional and hardness reports. IATF 16949 documentation is issued with the shipment when your market requires it.
What happens if a lot fails inspection?
The lot is re-inspected against the golden sample, and replacement pieces ship on the next available booking at our cost.
Can the specification be held on file?
Yes. Once approved, the specification is recorded against your part number so a reorder reproduces the IATF 16949-compliant build instead of a fresh interpretation.
Tell us the model, the fitment and the quantity and we will hold a production slot for you.



