Welcome to Auto, Motorcycle Parts & Accessories official website!

Turbocharged Engine Specification Example for Passenger Cars: Touring Version

Source:Aftermarket Engine Brackets / Time:2026-09-18

Turbocharged Engine Specification Example for Passenger Cars: Touring Version

This is a worked specification for turbocharged engine in a touring version programme. It is the document we would send a buyer who asks what exactly they are getting: the material, the dimensions that are actually controlled, the finish, and the checks that happen before anything is packed.

The touring version version exists because the duty cycle on passenger cars is not the same as on a showroom vehicle. Where the two are specified identically, something fails later — usually documentation that arrived after the container shipped.

Turbocharged Engine

Example specification

ItemTurbocharged Engine
ApplicationPassenger Cars
VersionTouring Version
Base materialBronze
Controlled dimensions5 key dimensions, recorded per lot
Tolerance band±0.5 mm
Finishpowder coated
MOQ3,000 pieces per specification
Sampling10 working days, 3 days per revision
ComplianceISO 9001

How the example is built up

  1. Start from the duty cycle, not from the catalogue photograph.
  2. Fix the base material in writing — Bronze, in this example.
  3. List the dimensions that are actually controlled and the tolerance on each.
  4. Name the finish and what it has to survive.
  5. State the inspection level and who pays when a lot fails.

Turbocharged Engine example

Processes involved

  • precision stamping
  • injection moulding
  • ultrasonic cleaning
  • sintering
  • surface grinding
  • rubber vulcanisation

Where this example applies

Programmes that run touring version most often specify this build for passenger cars. Related applications include courier fleets, aftermarket retail, dealership service, construction equipment, municipal fleets.

Checks before packing

  • Dimensional report against the approved drawing.
  • AQL 4.0 sampling on the finished lot.
  • Finish inspection under agreed lighting.
  • Carton drop test on the first lot of a new packing specification.

Questions buyers ask

What happens if a lot fails inspection?

The lot is re-inspected against the golden sample, and replacement pieces ship on the next available booking at our cost.

How long does sampling take?

Samples leave the factory in 10 working days, and each revision round adds about 3 days once you have seen the first piece.

What is the minimum order quantity?

The standard MOQ is 3000 pieces per specification. Mixed sizes inside one shipment are accepted once the total reaches that figure.

Do you handle mixed containers?

Yes. Most programmes consolidate several part numbers into one container to keep freight sensible at 3000 pieces per line.

Ask for the current catalogue and the specification sheet for this line.

Online customer service
WeChat contact
Customer service
Scan code to add Wechat (same mobile phone number)
Telephone consultation
Back to top