Forklift Solid Tires Specification Example for Trailer Axles: Racing Spec
Forklift Solid Tires Specification Example for Trailer Axles: Racing Spec
This is a worked specification for forklift solid tires in a racing spec programme. It is the document we would send a buyer who asks what exactly they are getting: the material, the dimensions that are actually controlled, the finish, and the checks that happen before anything is packed.
The racing spec version exists because the duty cycle on trailer axles is not the same as on a showroom vehicle. Where the two are specified identically, something fails later — usually a specification nobody had written down.

Example specification
| Item | Forklift Solid Tires |
|---|---|
| Application | Trailer Axles |
| Version | Racing Spec |
| Base material | PVC Coated Fabric |
| Controlled dimensions | 4 key dimensions, recorded per lot |
| Tolerance band | ±0.2 mm |
| Finish | anodised |
| MOQ | 3,000 pieces per specification |
| Sampling | 7 working days, 5 days per revision |
| Compliance | SGS |
How the example is built up
- Start from the duty cycle, not from the catalogue photograph.
- Fix the base material in writing — PVC Coated Fabric, in this example.
- List the dimensions that are actually controlled and the tolerance on each.
- Name the finish and what it has to survive.
- State the inspection level and who pays when a lot fails.

Processes involved
- gravity casting
- cold forging
- ultrasonic cleaning
- injection moulding
- assembly line testing
- anodising
Where this example applies
Programmes that run racing spec most often specify this build for trailer axles. Related applications include aftermarket retail, scooter fleets, export programmes, rental motorcycles, light trucks.
Checks before packing
- Dimensional report against the approved drawing.
- AQL 4.0 sampling on the finished lot.
- Finish inspection under agreed lighting.
- Carton drop test on the first lot of a new packing specification.
Questions buyers ask
How long does sampling take?
Samples leave the factory in 7 working days, and each revision round adds about 5 days once you have seen the first piece.
Can you match an existing sample?
Send a sample and we will reverse-engineer the specification, then produce a counter sample for approval before any bulk starts.
What is the minimum order quantity?
The standard MOQ is 3000 pieces per specification. Mixed sizes inside one shipment are accepted once the total reaches that figure.
What happens if a lot fails inspection?
The lot is re-inspected against the golden sample, and replacement pieces ship on the next available booking at our cost.
Tell us the model, the fitment and the quantity and we will hold a production slot for you.



