Welcome to Auto, Motorcycle Parts & Accessories official website!

Injection Valves Specification Example for Utility Trailers: Two-Piece Construction

Source:Backseat Car Organizer / Time:2026-09-18

Injection Valves Specification Example for Utility Trailers: Two-Piece Construction

This is a worked specification for injection valves in a two-piece construction programme. It is the document we would send a buyer who asks what exactly they are getting: the material, the dimensions that are actually controlled, the finish, and the checks that happen before anything is packed.

The two-piece construction version exists because the duty cycle on utility trailers is not the same as on a showroom vehicle. Where the two are specified identically, something fails later — usually reorders that did not match the approved sample.

Injection Valves

Example specification

ItemInjection Valves
ApplicationUtility Trailers
VersionTwo-Piece Construction
Base materialSintered Metal
Controlled dimensions6 key dimensions, recorded per lot
Tolerance band±0.05 mm
Finishpainted
MOQ2,000 pieces per specification
Sampling10 working days, 3 days per revision
ComplianceECE R90

How the example is built up

  1. Start from the duty cycle, not from the catalogue photograph.
  2. Fix the base material in writing — Sintered Metal, in this example.
  3. List the dimensions that are actually controlled and the tolerance on each.
  4. Name the finish and what it has to survive.
  5. State the inspection level and who pays when a lot fails.

Injection Valves example

Processes involved

  • precision stamping
  • heat treatment
  • shot blasting
  • ultrasonic cleaning
  • surface grinding
  • CNC machining

Where this example applies

Programmes that run two-piece construction most often specify this build for utility trailers. Related applications include export programmes, rental motorcycles, construction equipment, trailer axles, long-haul trucks.

Checks before packing

  • Dimensional report against the approved drawing.
  • AQL 2.5 sampling on the finished lot.
  • Finish inspection under agreed lighting.
  • Carton drop test on the first lot of a new packing specification.

Questions buyers ask

Can you match an existing sample?

Send a sample and we will reverse-engineer the specification, then produce a counter sample for approval before any bulk starts.

What testing is included?

Standard lots ship with dimensional and hardness reports. ECE R90 documentation is issued with the shipment when your market requires it.

What is the minimum order quantity?

The standard MOQ is 2000 pieces per specification. Mixed sizes inside one shipment are accepted once the total reaches that figure.

How long does sampling take?

Samples leave the factory in 10 working days, and each revision round adds about 3 days once you have seen the first piece.

Send the specification you are working to and we will confirm what we can match, what we would change and why.

Online customer service
WeChat contact
Customer service
Scan code to add Wechat (same mobile phone number)
Telephone consultation
Back to top