Cross Section Otr Tire Specification Example for Dealership Service: Standard Replacement
Cross Section Otr Tire Specification Example for Dealership Service: Standard Replacement
This is a worked specification for cross section otr tire in a standard replacement programme. It is the document we would send a buyer who asks what exactly they are getting: the material, the dimensions that are actually controlled, the finish, and the checks that happen before anything is packed.
The standard replacement version exists because the duty cycle on dealership service is not the same as on a showroom vehicle. Where the two are specified identically, something fails later — usually a fitment that looked right on paper and failed on the bench.

Example specification
| Item | Cross Section Otr Tire |
|---|---|
| Application | Dealership Service |
| Version | Standard Replacement |
| Base material | Bronze |
| Controlled dimensions | 4 key dimensions, recorded per lot |
| Tolerance band | ±0.2 mm |
| Finish | as machined |
| MOQ | 2,000 pieces per specification |
| Sampling | 7 working days, 3 days per revision |
| Compliance | TUV |
How the example is built up
- Start from the duty cycle, not from the catalogue photograph.
- Fix the base material in writing — Bronze, in this example.
- List the dimensions that are actually controlled and the tolerance on each.
- Name the finish and what it has to survive.
- State the inspection level and who pays when a lot fails.

Processes involved
- sintering
- cold forging
- CNC machining
- assembly line testing
- gravity casting
- precision stamping
Where this example applies
Programmes that run standard replacement most often specify this build for dealership service. Related applications include city buses, off-road bikes, delivery vans, rental motorcycles, dealership service.
Checks before packing
- Dimensional report against the approved drawing.
- AQL 1.5 sampling on the finished lot.
- Finish inspection under agreed lighting.
- Carton drop test on the first lot of a new packing specification.
Questions buyers ask
What happens if a lot fails inspection?
The lot is re-inspected against the golden sample, and replacement pieces ship on the next available booking at our cost.
Do you handle mixed containers?
Yes. Most programmes consolidate several part numbers into one container to keep freight sensible at 2000 pieces per line.
What testing is included?
Standard lots ship with dimensional and hardness reports. TUV documentation is issued with the shipment when your market requires it.
How long does sampling take?
Samples leave the factory in 7 working days, and each revision round adds about 3 days once you have seen the first piece.
Share a sample or a drawing and we will quote against a written specification, not against a photograph.



