This is a worked specification for 12v electric car fridge in a reinforced build programme. It is the document we would send a buyer who asks what exactly they are getting: the material, the dimensions that are actually controlled, the finish, and the checks that happen before anything is packed.
The reinforced build version exists because the duty cycle on delivery vans is not the same as on a showroom vehicle. Where the two are specified identically, something fails later — usually lead time that slipped twice before bulk started.

Example specification
| Item | 12V Electric Car Fridge |
|---|---|
| Application | Delivery Vans |
| Version | Reinforced Build |
| Base material | Neoprene |
| Controlled dimensions | 5 key dimensions, recorded per lot |
| Tolerance band | ±0.5 mm |
| Finish | zinc plated |
| MOQ | 1,000 pieces per specification |
| Sampling | 7 working days, 3 days per revision |
| Compliance | TUV |
How the example is built up
- Start from the duty cycle, not from the catalogue photograph.
- Fix the base material in writing — Neoprene, in this example.
- List the dimensions that are actually controlled and the tolerance on each.
- Name the finish and what it has to survive.
- State the inspection level and who pays when a lot fails.

Processes involved
- electroplating
- sintering
- surface grinding
- injection moulding
- shot blasting
- assembly line testing
Where this example applies
Programmes that run reinforced build most often specify this build for delivery vans. Related applications include off-road bikes, dealership service, racing teams, trailer axles, scooter fleets.
Checks before packing
- Dimensional report against the approved drawing.
- AQL 2.5 sampling on the finished lot.
- Finish inspection under agreed lighting.
- Carton drop test on the first lot of a new packing specification.
Questions buyers ask
What testing is included?
Standard lots ship with dimensional and hardness reports. TUV documentation is issued with the shipment when your market requires it.
Do you handle mixed containers?
Yes. Most programmes consolidate several part numbers into one container to keep freight sensible at 1000 pieces per line.
Can the specification be held on file?
Yes. Once approved, the specification is recorded against your part number so a reorder reproduces the TUV-compliant build instead of a fresh interpretation.
What is the minimum order quantity?
The standard MOQ is 1000 pieces per specification. Mixed sizes inside one shipment are accepted once the total reaches that figure.
Tell us the model, the fitment and the quantity and we will hold a production slot for you.