Welcome to Auto, Motorcycle Parts & Accessories official website!

Electric Power Steering System Specification Example for Dealership Service: OEM Replacement

Source:High Performance Bike Shock / Time:2026-09-18

Electric Power Steering System Specification Example for Dealership Service: OEM Replacement

This is a worked specification for electric power steering system in a oem replacement programme. It is the document we would send a buyer who asks what exactly they are getting: the material, the dimensions that are actually controlled, the finish, and the checks that happen before anything is packed.

The oem replacement version exists because the duty cycle on dealership service is not the same as on a showroom vehicle. Where the two are specified identically, something fails later — usually a fitment that looked right on paper and failed on the bench.

Electric Power Steering System

Example specification

ItemElectric Power Steering System
ApplicationDealership Service
VersionOEM Replacement
Base materialKevlar Composite
Controlled dimensions5 key dimensions, recorded per lot
Tolerance band±0.1 mm
Finishpowder coated
MOQ500 pieces per specification
Sampling10 working days, 5 days per revision
ComplianceSAE J431

How the example is built up

  1. Start from the duty cycle, not from the catalogue photograph.
  2. Fix the base material in writing — Kevlar Composite, in this example.
  3. List the dimensions that are actually controlled and the tolerance on each.
  4. Name the finish and what it has to survive.
  5. State the inspection level and who pays when a lot fails.

Electric Power Steering System example

Processes involved

  • rubber vulcanisation
  • assembly line testing
  • die casting
  • powder coating
  • electroplating
  • gravity casting

Where this example applies

Programmes that run oem replacement most often specify this build for dealership service. Related applications include fleet maintenance, boat trailers, passenger cars, municipal fleets, assembly programmes.

Checks before packing

  • Dimensional report against the approved drawing.
  • AQL 4.0 sampling on the finished lot.
  • Finish inspection under agreed lighting.
  • Carton drop test on the first lot of a new packing specification.

Questions buyers ask

What testing is included?

Standard lots ship with dimensional and hardness reports. SAE J431 documentation is issued with the shipment when your market requires it.

Can the specification be held on file?

Yes. Once approved, the specification is recorded against your part number so a reorder reproduces the SAE J431-compliant build instead of a fresh interpretation.

How long does sampling take?

Samples leave the factory in 10 working days, and each revision round adds about 5 days once you have seen the first piece.

What happens if a lot fails inspection?

The lot is re-inspected against the golden sample, and replacement pieces ship on the next available booking at our cost.

Send the specification you are working to and we will confirm what we can match, what we would change and why.

Online customer service
WeChat contact
Customer service
Scan code to add Wechat (same mobile phone number)
Telephone consultation
Back to top