Heavy Truck Tire Specification Example for Municipal Fleets: Standard Replacement
Heavy Truck Tire Specification Example for Municipal Fleets: Standard Replacement
This is a worked specification for heavy truck tire in a standard replacement programme. It is the document we would send a buyer who asks what exactly they are getting: the material, the dimensions that are actually controlled, the finish, and the checks that happen before anything is packed.
The standard replacement version exists because the duty cycle on municipal fleets is not the same as on a showroom vehicle. Where the two are specified identically, something fails later — usually packing that arrived crushed at the port.

Example specification
| Item | Heavy Truck Tire |
|---|---|
| Application | Municipal Fleets |
| Version | Standard Replacement |
| Base material | Powder Coated Steel |
| Controlled dimensions | 6 key dimensions, recorded per lot |
| Tolerance band | ±0.5 mm |
| Finish | anodised |
| MOQ | 500 pieces per specification |
| Sampling | 7 working days, 5 days per revision |
| Compliance | E-mark |
How the example is built up
- Start from the duty cycle, not from the catalogue photograph.
- Fix the base material in writing — Powder Coated Steel, in this example.
- List the dimensions that are actually controlled and the tolerance on each.
- Name the finish and what it has to survive.
- State the inspection level and who pays when a lot fails.

Processes involved
- cold forging
- injection moulding
- shot blasting
- ultrasonic cleaning
- assembly line testing
- gravity casting
Where this example applies
Programmes that run standard replacement most often specify this build for municipal fleets. Related applications include municipal fleets, courier fleets, camper conversions, utility trailers, off-road bikes.
Checks before packing
- Dimensional report against the approved drawing.
- AQL 1.5 sampling on the finished lot.
- Finish inspection under agreed lighting.
- Carton drop test on the first lot of a new packing specification.
Questions buyers ask
Do you handle mixed containers?
Yes. Most programmes consolidate several part numbers into one container to keep freight sensible at 500 pieces per line.
How long does sampling take?
Samples leave the factory in 7 working days, and each revision round adds about 5 days once you have seen the first piece.
What happens if a lot fails inspection?
The lot is re-inspected against the golden sample, and replacement pieces ship on the next available booking at our cost.
What is the minimum order quantity?
The standard MOQ is 500 pieces per specification. Mixed sizes inside one shipment are accepted once the total reaches that figure.
Share a sample or a drawing and we will quote against a written specification, not against a photograph.