Electronic Ignition System Specification Example for Export Programmes: OEM Replacement
Electronic Ignition System Specification Example for Export Programmes: OEM Replacement
This is a worked specification for electronic ignition system in a oem replacement programme. It is the document we would send a buyer who asks what exactly they are getting: the material, the dimensions that are actually controlled, the finish, and the checks that happen before anything is packed.
The oem replacement version exists because the duty cycle on export programmes is not the same as on a showroom vehicle. Where the two are specified identically, something fails later — usually documentation that arrived after the container shipped.

Example specification
| Item | Electronic Ignition System |
|---|---|
| Application | Export Programmes |
| Version | OEM Replacement |
| Base material | Zinc Plated Steel |
| Controlled dimensions | 6 key dimensions, recorded per lot |
| Tolerance band | ±0.2 mm |
| Finish | powder coated |
| MOQ | 3,000 pieces per specification |
| Sampling | 7 working days, 3 days per revision |
| Compliance | ECE R90 |
How the example is built up
- Start from the duty cycle, not from the catalogue photograph.
- Fix the base material in writing — Zinc Plated Steel, in this example.
- List the dimensions that are actually controlled and the tolerance on each.
- Name the finish and what it has to survive.
- State the inspection level and who pays when a lot fails.

Processes involved
- injection moulding
- sintering
- powder coating
- heat treatment
- cold forging
- anodising
Where this example applies
Programmes that run oem replacement most often specify this build for export programmes. Related applications include scooter fleets, boat trailers, assembly programmes, workshop replacements, agricultural trailers.
Checks before packing
- Dimensional report against the approved drawing.
- AQL 1.5 sampling on the finished lot.
- Finish inspection under agreed lighting.
- Carton drop test on the first lot of a new packing specification.
Questions buyers ask
What testing is included?
Standard lots ship with dimensional and hardness reports. ECE R90 documentation is issued with the shipment when your market requires it.
What is the minimum order quantity?
The standard MOQ is 3000 pieces per specification. Mixed sizes inside one shipment are accepted once the total reaches that figure.
What happens if a lot fails inspection?
The lot is re-inspected against the golden sample, and replacement pieces ship on the next available booking at our cost.
Do you handle mixed containers?
Yes. Most programmes consolidate several part numbers into one container to keep freight sensible at 3000 pieces per line.
Send the part number, the annual volume and the target market, and we will come back with a specification and a sampling plan.



