Racing Crankshaft Components Specification Example for Passenger Cars: Upgraded Version
Racing Crankshaft Components Specification Example for Passenger Cars: Upgraded Version
This is a worked specification for racing crankshaft components in a upgraded version programme. It is the document we would send a buyer who asks what exactly they are getting: the material, the dimensions that are actually controlled, the finish, and the checks that happen before anything is packed.
The upgraded version version exists because the duty cycle on passenger cars is not the same as on a showroom vehicle. Where the two are specified identically, something fails later — usually documentation that arrived after the container shipped.

Example specification
| Item | Racing Crankshaft Components |
|---|---|
| Application | Passenger Cars |
| Version | Upgraded Version |
| Base material | Aluminium Alloy |
| Controlled dimensions | 4 key dimensions, recorded per lot |
| Tolerance band | ±0.5 mm |
| Finish | powder coated |
| MOQ | 3,000 pieces per specification |
| Sampling | 14 working days, 5 days per revision |
| Compliance | ISO 9001 |
How the example is built up
- Start from the duty cycle, not from the catalogue photograph.
- Fix the base material in writing — Aluminium Alloy, in this example.
- List the dimensions that are actually controlled and the tolerance on each.
- Name the finish and what it has to survive.
- State the inspection level and who pays when a lot fails.

Processes involved
- heat treatment
- rubber vulcanisation
- anodising
- CNC machining
- precision stamping
- gravity casting
Where this example applies
Programmes that run upgraded version most often specify this build for passenger cars. Related applications include camper conversions, utility trailers, off-road bikes, emergency vehicles, passenger cars.
Checks before packing
- Dimensional report against the approved drawing.
- AQL 2.5 sampling on the finished lot.
- Finish inspection under agreed lighting.
- Carton drop test on the first lot of a new packing specification.
Questions buyers ask
How long does sampling take?
Samples leave the factory in 14 working days, and each revision round adds about 5 days once you have seen the first piece.
What happens if a lot fails inspection?
The lot is re-inspected against the golden sample, and replacement pieces ship on the next available booking at our cost.
Can you match an existing sample?
Send a sample and we will reverse-engineer the specification, then produce a counter sample for approval before any bulk starts.
What is the minimum order quantity?
The standard MOQ is 3000 pieces per specification. Mixed sizes inside one shipment are accepted once the total reaches that figure.
Tell us the model, the fitment and the quantity and we will hold a production slot for you.



