Auto Detailing Wax Specification Example for Assembly Programmes: Premium Line
Auto Detailing Wax Specification Example for Assembly Programmes: Premium Line
This is a worked specification for auto detailing wax in a premium line programme. It is the document we would send a buyer who asks what exactly they are getting: the material, the dimensions that are actually controlled, the finish, and the checks that happen before anything is packed.
The premium line version exists because the duty cycle on assembly programmes is not the same as on a showroom vehicle. Where the two are specified identically, something fails later — usually a fitment that looked right on paper and failed on the bench.

Example specification
| Item | Auto Detailing Wax |
|---|---|
| Application | Assembly Programmes |
| Version | Premium Line |
| Base material | Semi-Metallic Compound |
| Controlled dimensions | 6 key dimensions, recorded per lot |
| Tolerance band | ±0.1 mm |
| Finish | anodised |
| MOQ | 2,000 pieces per specification |
| Sampling | 14 working days, 5 days per revision |
| Compliance | ECE R90 |
How the example is built up
- Start from the duty cycle, not from the catalogue photograph.
- Fix the base material in writing — Semi-Metallic Compound, in this example.
- List the dimensions that are actually controlled and the tolerance on each.
- Name the finish and what it has to survive.
- State the inspection level and who pays when a lot fails.

Processes involved
- sintering
- precision stamping
- injection moulding
- ultrasonic cleaning
- rubber vulcanisation
- assembly line testing
Where this example applies
Programmes that run premium line most often specify this build for assembly programmes. Related applications include passenger cars, courier fleets, city buses, utility trailers, workshop replacements.
Checks before packing
- Dimensional report against the approved drawing.
- AQL 2.5 sampling on the finished lot.
- Finish inspection under agreed lighting.
- Carton drop test on the first lot of a new packing specification.
Questions buyers ask
Can the specification be held on file?
Yes. Once approved, the specification is recorded against your part number so a reorder reproduces the ECE R90-compliant build instead of a fresh interpretation.
How long does sampling take?
Samples leave the factory in 14 working days, and each revision round adds about 5 days once you have seen the first piece.
Can you match an existing sample?
Send a sample and we will reverse-engineer the specification, then produce a counter sample for approval before any bulk starts.
What happens if a lot fails inspection?
The lot is re-inspected against the golden sample, and replacement pieces ship on the next available booking at our cost.
Share a sample or a drawing and we will quote against a written specification, not against a photograph.



