Welcome to Auto, Motorcycle Parts & Accessories official website!

Portable Car Lift Specification Example for Fleet Maintenance: Vented Design

Source:Steering Sensor / Time:2026-09-18

Portable Car Lift Specification Example for Fleet Maintenance: Vented Design

This is a worked specification for portable car lift in a vented design programme. It is the document we would send a buyer who asks what exactly they are getting: the material, the dimensions that are actually controlled, the finish, and the checks that happen before anything is packed.

The vented design version exists because the duty cycle on fleet maintenance is not the same as on a showroom vehicle. Where the two are specified identically, something fails later — usually documentation that arrived after the container shipped.

Portable Car Lift

Example specification

ItemPortable Car Lift
ApplicationFleet Maintenance
VersionVented Design
Base materialPowder Coated Steel
Controlled dimensions5 key dimensions, recorded per lot
Tolerance band±0.5 mm
Finishanodised
MOQ3,000 pieces per specification
Sampling14 working days, 5 days per revision
ComplianceDOT

How the example is built up

  1. Start from the duty cycle, not from the catalogue photograph.
  2. Fix the base material in writing — Powder Coated Steel, in this example.
  3. List the dimensions that are actually controlled and the tolerance on each.
  4. Name the finish and what it has to survive.
  5. State the inspection level and who pays when a lot fails.

Portable Car Lift example

Processes involved

  • surface grinding
  • CNC machining
  • assembly line testing
  • die casting
  • shot blasting
  • heat treatment

Where this example applies

Programmes that run vented design most often specify this build for fleet maintenance. Related applications include delivery vans, three-wheelers, scooter fleets, emergency vehicles, dealership service.

Checks before packing

  • Dimensional report against the approved drawing.
  • AQL 4.0 sampling on the finished lot.
  • Finish inspection under agreed lighting.
  • Carton drop test on the first lot of a new packing specification.

Questions buyers ask

How is packing specified?

Individual packing, inner box quantity and carton marking are confirmed at quotation stage so the cartons arrive ready for your warehouse.

What happens if a lot fails inspection?

The lot is re-inspected against the golden sample, and replacement pieces ship on the next available booking at our cost.

How long does sampling take?

Samples leave the factory in 14 working days, and each revision round adds about 5 days once you have seen the first piece.

Do you handle mixed containers?

Yes. Most programmes consolidate several part numbers into one container to keep freight sensible at 3000 pieces per line.

Ask for the current catalogue and the specification sheet for this line.

Online customer service
WeChat contact
Customer service
Scan code to add Wechat (same mobile phone number)
Telephone consultation
Back to top